Laserfiche WebLink
C O <br />Htz 0 <br />H 'V <br />rn H <br />i0� <br />H t7 <br />OHCC <br />H LT70 <br />z 13 <br />H H <br />an <br />O H <br />ntyrA <br />F3 0 En <br />CO <br />C:") <br />i t <br />Meeting Minutes <br />Mervyn's <br />November 12, 1991 <br />Page 2 <br />11 Energy Code per State of Washington, January 1992. <br />12. Everett Public Works Building Division to review entry security gates a^u recommend <br />to SSOE. <br />13. Low voltage wiring with teflon coating approved for use in ceiling plenum. <br />14. Building plan review and approval - three to four weeks. <br />15. Existing building structure if not being altered by construction, is okav for seismic <br />requirements. Ceiling shall be installed per seismic code. <br />16. Hauling permit required by demolition contractor for hauling and dumping of demolition <br />materials. Recycling of drywall materials required. <br />17. No asbestos report is required by Everett Building Division. <br />18. Bob Meza can sign permits for Mervyn's as Mervyn's Representative. <br />Submitted: John Hux <br />JHi rsr <br />vMM I <br />SSOE, INC. • 200 MOTT FOUNDATION BUILDING • FLINT, MICHIGAN 48502 <br />Y <br />0 <br />