Laserfiche WebLink
mix <br />C hl <br />1"5N p� H �o CONFERENCE REPORT <br />CA H nQ <br />oy U DATE HELD: 4/10/92 & 4/14/92 <br />0 ApR2 � D <br />H t g SUBJECT: Mervyn's - Everett Mall <br />l� SSOE job # 916250-87 p%bl T c`pF.........., <br />................. <br />IN ATTENDANCE: Everett Fire Department <br />1-3wO/kSF�F <br />y Kim Procunier, SSOE <br />O H <br />0UCA <br />t� � DISTRIBUTION: Bob Meza, Mervyn's <br />z ,.3 CA Dave Nevens, WLB <br />y O W Dan Curtis, WLB <br />John Hux, SSOE <br />Ken Hanson, SSOE <br />Jeff McFall, City of Everett <br />Sam Preston, City of Everett <br />I called Mr. Preston concerning stock shelving and whether it had to be "perforated" or not. He <br />said that it was a "mute point" and that he had already discussed stock shelving with Jeff <br />Bennett of McKinstry. Mr. Preston said that Everett's preference was to have it perforated but <br />it is not a requirement. <br />I then spoke with Mr. Bennett concerning his conversation with Mr. Preston. He said he and <br />Mr. Preston spoke at length concerning sprinklers and the stock shelving layout but did not <br />specifically discuss "perforated" or "non -perforated" shelving. Mr. Bennett stated that the code <br />1 does not address perforated shelving for heights less than 12' -0 above finished floor. <br />�`. <br />... I called Mr. Preston again on 4/13/92 and was told by the receptionist he was not working on <br />iMonday and that I should call back on Tuesday 4/14/92. <br />I returned a call to Mr. Preston on 4/14/92 to reconfirm stock shelving issue. He stated that <br />`ter perforated stock shelving was preferred by the City of Everett but is not a code requirement. <br />Attached please find minutes from a February 25, meeting in which stock shelving was <br />discussed. (RE: Item #2.) <br />Submitted by: Kim Procunier <br />L` 0 McM•ns\91625081\wp\CR2 <br />4 <br />SSOE, INC. • 1050 WILSHIRE DRIVE, SUITE 260 • TROY, MICHIGAN 48084 <br />