Laserfiche WebLink
4D <br />i-3 r~n <br />ty�H <br />HHW <br />�HH <br />y <br />C/� H <br />H�G <br />OH <br />^NC8 <br />Y. V <br />aHz. <br />t HH <br />8y H <br />ol7[n <br />zy[A <br />HOrn <br />DATE HELD: <br />SUBJECT: <br />LOCATION: <br />ATTENDANCE: <br />DISTRIBUTION: <br />CONFERENCE REPORT <br />htM <br />February 25, 1992 <br />Mervyn's <br />SSOE Job No. 916250-81 <br />City of Everett, Building Division <br />Everett, Washington <br />wa <br />Jeff McFall - <br />Everett <br />Sam Preston - <br />Everett Asst. Fire Marshal <br />Kim Procunier - <br />SSOE-Flint <br />Bob Sherman - <br />SSOE-Flint <br />John Hux - <br />SSOE-Troy <br />All in Attendance <br />Gayle Sherman - <br />Mervyn's <br />Bob Meza - <br />Mervyn's <br />Dave Nevens - <br />W.L. Butler <br />Ken Hanson - <br />SSOE-Troy <br />File <br />1. Jeff asked if SSOE had investigated spray on 1 hr. fire protection for steel at first floor <br />r�t <br />ceiling structure. Concern with compartmental design with I hr. separation walls and <br />that SSOE has complied with <br />no protection below. Kim discussed design approach and <br />P <br />the City's request. Discussion took place about original building type and rating and <br />what was actually built. S. Preston had no problem with the compartmental design to <br />bring areas below the 96,000 ft' requirement. With building sprinklered and SSOE <br />'' <br />Vm% <br />compliance as originally requested, S. Preston will not require spray on fire protection <br />below. <br />2. Discussion took place about shelving and sprinklers in stock rooms. Stock shelving is <br />8 ft. high and does not require in rack sprinkler per code. S. Preston discussed use of <br />shelving with holes to allow water to penetrate lower shelving. SSOE will discuss with <br />Mervyn's. This is not a code requirement but would be preferred by City. <br />s� <br />3. Roof permit is ready and contractor has been notified. Uiscussion took place about new <br />insulation and the fact that the ceiling space or cavity is not sprinklered. City is not <br />requiring sprinklers above ceiling but would require fire rated vapor barrier between <br />metal deck and insulation. In the event of heat reaching metal deck and melting <br />insulation on roof this barrier would prevent flammable gases from entering ceiling <br />cavity inside building. This issue is still pending and under discussion between SSOE <br />_ <br />and City. SSOE has attempted to resolve this issue with City but has had difficulty <br />try to resolve. <br />reaching Jeff McFall to discuss. Will contact 3-2-92 and <br />Submitted: John Hux <br />JH/rsr <br />ff"01F <br />SSOE, INC. • 200 MOTT FOUNDATION BUILDING • FLINT, MICHIGAN 48502 <br />r <br />