My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 SE EVERETT MALL WAY 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
220
>
220 SE EVERETT MALL WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2019 3:51:14 PM
Creation date
2/13/2017 8:10:18 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
220
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BARGHAUSEN �vONSULTING ENGINEERS, INC. <br />"Land Planning, Survey, anc Design Specialists" <br />Tri-State Construction <br />959 - 108th Street N.E. <br />Uellevue, 1YA 98004 <br />AI[n: <br />R e: <br />Gentlemen: <br />March 2, 1987 <br />Mr. Jerry Grady or Mr. Don Rendahl <br />Third Avenue S.E. Improvements/L.I.D. 716A <br />Proposed ARCO AM/PM Facility No. 5446 <br />Our Job No. 2197 <br />D <br />���0 f� <br />�% � <br />AR p, �n, <br />��.... 198� `J <br />p ry oF........... <br />ubqQ W� FRFj',"`\. <br />�'pf. <br />I spoke with your company last week regarding the timing of your final <br />improvements on Third Avenue S.E. adjacent to the proposed ARCO faciliry which will be <br />locaced at the southwest corner of Third Avenue S.E. and Everett Mall Way S.E. N'e <br />also discusseJ the possibility oP having your firm install a side sewer stub across Third <br />Avenue S.E. to serve tlie proposed ARCO building as a function of your contract. <br />When making building permit application for the ARCO facility, it was sug- <br />gested by Gordon Witcher at the City of Everett, that the City would desire ro have this <br />installation permitted and installed by your firm under your present contract with the <br />City as a more practical and coordinated effort. Lnclosed for your review in this regard, <br />please fir.d three copies of the side sewer installation plan as we woutd desire fur our <br />devclopment. Following your review of the enclosed design, please provide our office <br />with a written proposal for your Cirm ro obtain the permit and install the six-inch PVC <br />sidc sewer stub ro the ARCO property. <br />Ne understand that you still have the final lift of asplmlt to place un Third <br />Avenue S.C., and it would obviously be to the benefit of all concerned to in�tall the <br />sewer crossing as soon as possible. We remain available to answer any questions or <br />provide additional information upon request. \Ve �wait your response in this reg�rd. <br />Sincerely, <br />Al Kendall <br />Project Engineer <br />AK/sm <br />C225.'16 <br />enc: (3) Side Sewer Installation Plan <br />cc: Mr. Gordon Witcher, City of Everet[ Engineering Depar[men[ (w/enc.) <br />Mr. 14altcr Tubandt, ARCO <br />Mr. Chuck Hutcl�ens, ARCO <br />6625 South 190th, 8102 • Kent, Washington 98032 •(206) 872•5522 <br />
The URL can be used to link to this page
Your browser does not support the video tag.