Laserfiche WebLink
�:.�:.,..,_._......,a:�z�.._ �:a: ° �.�.5..�:... <br />2. A landscape strip a minimum of 5 feet aide must be g�rovided along the <br />entire east property line as shown on the site plan dated 3/27/86. <br />This landscaping should be evergreens and provide a screen a minimum of <br />3 feet high. The intent oF this landscaping is to shield car lights <br />and provide separation from adjacent properties. A detailed <br />landseaping plan must be submitted to and approved by the Planning <br />Department prior to the issuance of any permits, The landscape plan <br />aoproved on 10/23/86 meets these requirements. (SEPA Light �and Glare, <br />Aesthetics, and Oth�r Policies) <br />3. Screening of all outdoor storage areas, including che tire storage must <br />be pro��ided. This must consist of a solid 6—foat high sight-0bscuring <br />fence. (SEPA Aesthetics Policies) <br />4. The existing tire manufacturing facility nas an outdoor area xhere a <br />machine bloHs rubber bits into a container. This must be completely <br />enclosed or screened so that it is not v3sible and the rubber cannot <br />escape. (SEPA Aestheties Policy) <br />f5. The project site is in the North Creek Drainage Basin and North �reek <br />and an associated wetland run t.hrough the property located directly to <br />the south. North Creek is a major producer of coho. chinook, and <br />sockey salmon, and steelhead and cutthroat trout. Fish production 1n <br />North Creek is highly dependent on continued good quality Water, <br />Therefore, the following measures must be takcn to ensure that gasoline <br />spills fT�om the underground tanks and storm xater quality do not <br />adversely effeci Horth Creek; <br />The storm drain system for the gasoline station must have a valve which <br />can shut off all floas leaving the system in case of a fuel spill. The <br />valve must be closed prior to any filling of the underground tanks and <br />in the event of a fuel spill or, the site. Procedures for use of the <br />shut off valve must be posted on the site. <br />An oil—r+ater separator must be provided. The type of separator used <br />r�ust be approved by the City Drainage Engineer. The owner must <br />maintain the oil—xater separator on a regular basis following the <br />maintenance schedule on the approved drainage plan. <br />' A grass lined swale with rock check dams must be provided. Arainage <br />must be routed through the sWale prior to leaving the site and entering <br />the grass lined detention pond to the southwest. <br />The underground storage tanks must be double containment fiberglass <br />tanks with an alarm leak monitoring system. A spill protector must be <br />provided at the tank fill points. <br />A curb must be provided along the edge nf the pavement adjacent to the <br />Frass—lined swale to keep site drainage/fuel spills from entering the <br />grass—lined saale instead of the detention system. <br />Y <br />_s'l,i�' � � <br />l• ( <br />4 <br />� ` � {, 1 � t <br />