Laserfiche WebLink
44 <br />r <br />{� <br />} hl <br />2. A landscape strip a minimum of 5 feet wide must be provided along the <br />entire east property line as shown on the site plan dated 3/27/86. <br />This landscaping should be evergreens and provide a screen a minimum of <br />3 feet high. The intent of this landscaping is to shield car lights <br />and provide separation from adjacent properties. A detailed <br />landscaping plan must be submitted to and approved by the Planning <br />Department prior to the issuance of any permits. The .landscape plan <br />approved on 10/23/86 meets these requirements. (SEPA Light and Glare, <br />Aesthetics, and Other Policies) <br />3. Screening of all outdoor storage areas, including the tire storage must <br />be provided. This must consist of a solid 6-foot high sight -obscuring <br />fence. (SEPA Aesthetics Policies) <br />4. The existing tire manufacturing facility has an outdoor area where a <br />machine blows rubber bits into a container. This must be completely <br />enclosed or screened so that it is not visible and the rubber cannot <br />escape. (SEPA Aesthetics Policy) <br />*5. The project site is in the North,Creek -.Drainage Basin and North Creek <br />and an associated wetland run through —the --site directly- to the south. <br />North Creek is a major producer of coho, Chinook, and sockey salmon, <br />and steelhead and cutthroat trout. Fish production in North Creek is <br />highly dependent on continued good quality water. Therefore, the <br />following measures must be taken to ensure that gasoline spills from <br />the underground tanks and storm water quality do not adversely effect <br />North Creek: <br />On -site detention is required for the gas station and service station <br />to the south. The size of the detention facility must be sized to <br />accommodate water that would be used to flush the site during a fuel <br />spill event. The detention facility must have a valve which can shut <br />off all flows leaving the system in case of a fuel spill. The valve <br />must be closed prior to any filling of the underground tanks and in the <br />event of a fuel spill on the site. Procedures for use of the shut off <br />valve must be posted on the site. <br />An oil -water separator must be provided. The type of separator used <br />must be approved by the City Drainage Engineer. <br />A grass lined Swale must be provided. Drainage from the detention <br />system must be routed through the Swale prior to leaving the site and <br />entering the grass lined detention pond to the south. <br />The underground storage tanks must be double containment fiberglass <br />tanks with an alarm leak monitoring system. A spill protector must be <br />provided at the tank fill points. <br />A curb must be provided along the edge of the pavement adjacent to the <br />grass -lined Swale to keep site drainage/fuel spills from entering the <br />grass -lined swale instead of the detention system. (SEPA Risk of <br />Upset, Water, and Flora and Fauna Policies) <br />