My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
35 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
35
>
BASE FILE
>
35 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 2:33:17 PM
Creation date
2/13/2017 8:21:21 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
35
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FOR DEVELOPER: <br />The following information is provided for the developer's benefit. These are not SEPA conditions but are <br />asson,iated with other laws or requirements. All requirements are preliminary in nature, and are based upon <br />the preliminary site plan and the ordinances in effect at time of submittal for SEPA review. The proposal <br />must comply with all ordinances in effect at the'.ime a complete building permit application is filed, <br />including those not specifically set forth herein. Contact the Planning Department tjr information <br />regarding appeals processes for the requirements lis!ed in this document. <br />A Public Works Permit is required for this project. Detailed drawings in accordance with City Design <br />and Construction Standards shall be submitted to the Public Works Department, showing site <br />parking layout, landscaping, utilities, storm drainage, temporary construction erosion control, and all <br />required improvements in the public right-of-way. Public Works Department approval of these <br />drawings is required prior to any permits being issued. All improvements shall be completed, <br />approved and warranted before the Occupancy Permit is issued/final approval is granted. <br />Full standards half street improvementq are required to 2nd Avenue SE and intersection including but <br />not limited to curb, gutter, sidewalks, street widening and drainage control per City Design <br />Standards. <br />3. Parking must be per City Zoning Code and City Design and Construction Standards for <br />Development. <br />4. Ten feet of right-of-way is to be dedicated to the City for street purposes on the proposals 2nd <br />Avenue frontage. <br />5. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br />6. This project must comply with the current City of Everett Building Code and Sprinkler Ordinance. <br />Special charges for connection to the sewer and water systems in accordance with Ordinance 1996 <br />94 and subsequent revision are applicable. These charges are based on projected water usage and <br />can be substantial. Applicant is encouraged to obtain a copy of the Ordinance and determine <br />estimated charges prior to building permit application. The actual charges shall be computed by the <br />Public Works Department per the ordinance in effect at the time and according to the information on <br />the approved plans at the time of building permit issuance. <br />8. The driveways on 2Id Avenue SE and SE Everett Mall Way must be removed and replaced with <br />curb, gutter and sidewalk per City Standards. <br />9. Lack of comment on the plans submitted with the application does not constitute approval of these <br />plans. <br />10. A fire hydrant is required within 200 driving feet but not closer than 50 fee of every structure. <br />11. City streets are to be kept clear of dirt and debris at all times during construction. Dust suppression <br />and street cleaning must occur as directed by the Public Works Inspector. <br />12. A one year warranty is required on the public improvement for an amount not less than 10% of the <br />cost of construction and shall run for one year from the date of final approval/issuance of the first <br />Occupancy Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.