Laserfiche WebLink
4. In order to minimize erosion, any spoil piles must be covered with plastic sheeting or other <br />impervious covering staked to the ground or anchored with rocks or sandbags. Berms, earthen or <br />otherwise, should be constructed at the perimeter of excavated areas to prevent adjacent site runoff <br />from entering the excavations. (SEPA Earth and Water Policies) <br />5. If contamination of thi urrounding soils is discovered, and remediation will take place, an erosion <br />control plan must be submitted for approval by the Public Works Department. (SEPA Earth and <br />Water Policies) <br />The lead agency for this proposal has determined that it does not have a probable significant adverse <br />impact on the environment. An Environmental Impact Statement is not required under RCW <br />43.21C.0302(23)(c). This determination assumes compliance with State law and City ordinances related to <br />general environmental protection including but not limited to right-of-way improvement requirements, <br />drainage, etc. This decision was made after review of a completed environmental checklist and other <br />information on file with the !ead agency. This information is available to the public on request. This <br />Mitigated Determination of Non -Significance is specifically conditioned on compliance with the conditions <br />attached hereto which are incorporated by reference as if fully set forth herein. <br />This Final MDNS is issued under WAC 197-11-355. A 14-day public comment period for this proposal has <br />been completed. <br />Responsible <br />Official: <br />Address: <br />Date: <br />Signature: <br />Allan Giffen, Director, Planning and Community Development <br />2930 Wetmore Avenue, Suite 8-A, Everett, WA 98201 <br />June 21 <br />You may appeal this det mation by filing an appeal on forms provided by the Planning Department and a <br />fee to the Planning a,perCommunity Development Pe mit Services Counter at 3200 Cedar Street, 2nd Floor, <br />no later than 14 da s from the date above. <br />Contact David Tyler to read or ask about the procedures for SEPA appeals <br />Notes: <br />1, A MDNS may be withdrawn in the event of significant changes in the proposal, disclosure of new <br />significant information, misrepresentation by the applicant, or failure to comply with the conditions <br />upon which this Mitigated Determination of Non -Significance is predicated. <br />2. This land use permit shall terminate if the applicant does not apply for a building permit within 18 <br />months (or, with an extension, 24 months), except where a time limit on the land use permit is <br />otherwise established under federal or state law, city ordinance, or an executed development <br />agreement. <br />�i <br />