Laserfiche WebLink
10/25/2012 City of Everett <br />9:28:39AD1 <br />INSPECTION ACTIVITY REPORT <br />Permit No. Cl 106-004 Site Address 35 SE EVERETT MALL WAY <br />Applied 6132011 Applicant <br />Approved 6/132011 Owner NGUYENTRUNG <br />Issued 6/16/2011 Contractor OWNER <br />Parent Permit No. Description DIVIDE AREA INTO TWO SPACES <br />Notes ADDING RESTROOM FOR EACH SPACE <br />SPACES #104 & 105, TENANTS UNKNOWN <br />Lot <br />Block <br />Tract <br />Page I <br />Scheduled <br />Conudctcd <br />'hone <br />Insnector <br />Result <br />Remarks <br />I isoeclor's Comments <br />DWF <br />Corr Red <br />q <br />Sec notes <br />Inspected Gaming divider ws'all bebam <br />(1201-101, <br />6^_02011 <br />Pmming <br />Units104/105- and framing for t0 <br />bathroom <br />Framing for Unit 105 only- approved to <br />cover. dr)ivall/vaporbarrier <br />Correction: <br />1. Unit 104- need to gei numbing rough in <br />sign off & air -seal 10's A' Horizontal & <br />Vcnical <br />Note Engineer design for horwater tanks <br />20 gallon on ceiling of bathrooms <br />620/2011 <br />6/20/2011 <br />PlbgRoughln <br />DXW <br />PtAppr-CorrReq <br />Unit 105-see notes <br />Snit 105 <br />Noot�c`oor Units: <br />1. Unit 15 pan required under hotu'ater <br />tank with drain to outside <br />2. Relief line for homvatertank to terminate <br />6" minimum to 24" off grade <br />Plumbing Groundwork ok andwaste vents - <br />unit 105 ok- water ok-roughin unit 105 <br />6202011 <br />6202011 <br />PlbgRoughn <br />DXW <br />Corr Rcqd <br />See 06.20-I l Plmb <br />Groundwork <br />6202011 <br />6202011 <br />PlbgGrWotk <br />DXW <br />Corr Rcqd <br />Unit 104-See notes <br />Corrections: <br />1. Unit 104. 3" floor cicanout required <br />2. Drain pain required under hotwatcr tank <br />with drain to outside <br />3. Relief line to go to outside and terminate <br />6" minimum to 24" off grade <br />620/2011 <br />6202011 <br />MechRougldn <br />DXW <br />Corr Rcqd <br />Mechanical not <br />complete <br />7/12/2011 <br />7/122011 <br />Framing <br />DWF <br />ParrialApproval <br />See notes <br />Partial Approval <br />1. Subject to Plumbing/Mechanical rough <br />in sign off before cover walls in data room <br />& ceiling <br />7/12/2011 <br />7/12/2011 <br />PlbgRoughln <br />SDP <br />Approval <br />As per notes <br />Plumbing rough ok as noted: <br />1. Bring floor clean out up to floor level for <br />final <br />2. Drain pan for hotwater tank must have <br />drain to outside <br />3. Strap water hearerar final <br />4. Vacuum breaker required at final on <br />holwatertank <br />7/122011 <br />7/12/2011 <br />MechRoughln <br />SDP <br />ParrialApproval <br />Recall exhaust fans <br />when ready <br />_Y3 <br />CRWsv��. �,as <br />INSPl2 <br />