My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 SE EVERETT MALL WAY 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
405
>
405 SE EVERETT MALL WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 3:19:51 PM
Creation date
2/13/2017 8:22:28 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
405
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4b4f0 .-j <br />5 1. <br />BARGHAUSEN CONSULTING ENGINEERS, INC. <br />"Land Planning, Survey, and Design Specialists" <br />March 31, 1987 <br />Mr. Gordon Witcher <br />City of Everett <br />Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />Re: Greentree Plaza Shopping Center Project <br />Our Job No. 2092 <br />Dear Gordon: <br />C1TY OF EVERETT <br />Public Works Dept <br />For your final review and approval, I am forwarding four blueline prints of the <br />civil engineering design plans prepared by our office for the above -referenced project <br />which have been revised in accordance with your redmark review comments. More <br />specifically, the plan changes made are outlined as follows: <br />1. SITE PLAN/SHEET 1 OF 6) <br />a. We have added "C" curbing to the centerline of the most westerly <br />site access off Everett Mall Way in accordance with your redmarked <br />comment. <br />b. We have improved the "stacking" at the central site access off <br />Everett Mall Way in accordance with your redmarked comment. <br />2. [TRADING AND DRAINAGE PLAN (SHEET 2 OF 6) <br />a. We have revised the on -site storm drainage detention system to <br />provide a 100,000 cubic foot capacity regional storm drainage <br />detention system. The detention system shown on the plans has <br />been designed in accordance with criteria provided by Mr. Dan <br />Mathias of your office. <br />3. DETAIL SHEET (SHEET 3 OF 6) <br />a. We have revised the storm drainage detention vault and outflow <br />control structure details per the 100,000 cubic foot detention design. <br />6625 South 190th, #102 0 Kent, Washington 98032 0 (206) 872-5522 <br />
The URL can be used to link to this page
Your browser does not support the video tag.