My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 SE EVERETT MALL WAY 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
405
>
405 SE EVERETT MALL WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 3:19:51 PM
Creation date
2/13/2017 8:22:28 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
405
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BARGHAUSEN CONSULTING ENGINEERS, INC. <br />"Land Planning, Survey, and Design Specialists" <br />June 2, 1987 <br />Mr. Gordon Witcher <br />City of Everett <br />Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: Greentree Plaza Shopping Center Project <br />Our Job No. 2092 <br />Dear Gordon: <br />� k!9 ih <br />iu_u� r 021987 <br />CITY OF EVERETT <br />Public Works Dept. <br />We have completed the required plan modifications pursuant to your final <br />review of the Engineering Design Plans prepared by our office for the above -referenced <br />project. The specific plan changes are outlined as follows. <br />Site Plan (Sheet 1 of 6) <br />a. We have revised the notation of 14, which reads "16 4-inch-wide <br />yellow stripes at 2 feet on center' to read "16 4-inch-wide white <br />stripes at 2 feet on center" in accordance with your red -marked <br />comment. <br />b. We have added a note to our site plan to insure and allow clearance <br />between concrete detention/retention wall and Target pylon sign. <br />2. Grading and Drainage Plan (Sheet 2 of 6) <br />a. We have shown the proposed 24-inch concrete cross culvert near the <br />northwest property corner on this sheet per your red -marked <br />comments. <br />b. We have provided a 12-inch PVC pipe between Catch Basin No. 2 <br />and Catch Basin No. 7A, instead of a Tee connection into the <br />24-inch concrete, per your red -marked comments. <br />C. We have changed all the CMP storm pipes to concrete in accordance <br />with your red -marked comment. <br />d. The 24-inch concrete storm pipe from Catch Basin No. 5 will <br />discharge directly into the detention vault sump per your comment. <br />6625 South 190th, *102 • Kent, Washington 98032 0 (206) 872.5522 <br />
The URL can be used to link to this page
Your browser does not support the video tag.