Laserfiche WebLink
e. If store front glass doors are part uf the project, they should have locking case <br />bolts top and bottom. The door ,hould have a maximwn security dead-bolt with 1 <br />3/4" throw and 3/4" laminated steel. <br />f. Metal security bay doors can be secured with 3/8" case-hazdened steel hasps or <br />chain and padlocks with 1/2" case-hardened steel shackles. <br />g. The more o�ce windows that aze visible to the parking azea, the safer the azea is <br />from assaults and thefts. <br />h. If utilizing fencing, it sho;ild be 6 feet chain link. <br />i. During the final stages of conslruction, please contact Dick 'i'hornberry, Crime <br />Prevention Officer, at 259-0416 for further security recommendations. <br />2. 'The Snohomish County PUD currently has sufficient capacity to serve the proposed <br />development. For further information about the electrical service requirements for this <br />project, please call Kurt Martin cf the District's Customer Engineering Office, Everett at <br />258-8291. <br />3. GTE Northwest Incorporated will provide service to the site. However, new telephone <br />cable construction will be required in conjunction with the site development. GTE's <br />engineering will begin when they �re notified of your construction schedules and <br />telephone requirements. <br />Please contact Michael Hupf, Senior Engineer, at 356-4052 should you require additional <br />information. <br />� ��� <br />�� , <br />�F.; <br />? r"' <br />;:�..- <br />�:.; <br />