My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
500 SE EVERETT MALL WAY A BASE FILE 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
500
>
BASE FILE
>
500 SE EVERETT MALL WAY A BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 8:55:55 AM
Creation date
2/13/2017 8:25:06 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
500
Unit
A
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. If store front glass doors are part uf the project, they should have locking case <br />bolts top and bottom. The door ,hould have a maximwn security dead-bolt with 1 <br />3/4" throw and 3/4" laminated steel. <br />f. Metal security bay doors can be secured with 3/8" case-hazdened steel hasps or <br />chain and padlocks with 1/2" case-hardened steel shackles. <br />g. The more o�ce windows that aze visible to the parking azea, the safer the azea is <br />from assaults and thefts. <br />h. If utilizing fencing, it sho;ild be 6 feet chain link. <br />i. During the final stages of conslruction, please contact Dick 'i'hornberry, Crime <br />Prevention Officer, at 259-0416 for further security recommendations. <br />2. 'The Snohomish County PUD currently has sufficient capacity to serve the proposed <br />development. For further information about the electrical service requirements for this <br />project, please call Kurt Martin cf the District's Customer Engineering Office, Everett at <br />258-8291. <br />3. GTE Northwest Incorporated will provide service to the site. However, new telephone <br />cable construction will be required in conjunction with the site development. GTE's <br />engineering will begin when they �re notified of your construction schedules and <br />telephone requirements. <br />Please contact Michael Hupf, Senior Engineer, at 356-4052 should you require additional <br />information. <br />� ��� <br />�� , <br />�F.; <br />? r"' <br />;:�..- <br />�:.; <br />
The URL can be used to link to this page
Your browser does not support the video tag.