Laserfiche WebLink
� <br />c <br />Plans for such system shall be submitted to the Fire Marshal for review and approval prior to <br />installation. Submittal shall include cut sheets of all equipment intended for use. Appropriate trip <br />tests, wimessed by a Fire Department inspector, shal] be performed, along with a certificate of <br />completion, prior to final acceptance of the system. <br />Fire alarm systems shall be installed according to NFPA Standazd 72. <br />Fire alarm systems shall be installed under permit of the City of Everett Building Pepartment. <br />Electrical inspections and approval are required prior to calling for acceptance tests. Call (425) 257- <br />8810 for permit information. <br />14. Exterior lighting shall be directed away or shielded from adjacent streets and properties. <br />GENERAL INFORMATION <br />1. Puget Sound Energy is the natural gas provider in this azea. To initiate new service orders, please <br />contact Marilyn Davis Westlund at (425)356-7�J2 at least 90 days prior to the required in-service <br />date. <br />Any relocation of existing gas facilities for this development will be at the developer's sole expense, <br />and requires 90 days minimum notice. Please contact Elaine Babby at (206)224-2018 to coordinate <br />relocation requests. <br />2. The Snohomish County PUD cutrently has sufficient capacity to serve the pmposed development. <br />For further information about the electrical service requirements for ehis project, please call Ku�-t <br />Martin of the District's Customer Engineering Off'ice, Everett at 258-8291. <br />Verizon Northwest has facilities near this ]ocation. However, any building entrances must be <br />coordinated at least 60 days in advance. The cost of any relocation of Verizon facilides that is <br />required to conswct the new apartments will be at the total expense of the developer. Any relocation <br />will take 60 to 120 days. Please contact Mike Hupf, Engineer at (425)356-4053 or Mike Bly, <br />Engineer at (425)356-4034 if you have any questions regazding this building enVance. <br />6� <br />