Laserfiche WebLink
3. GTE Northwest Incorporated wi11 provide service to the site. <br />However, new telephone cable construction will be required <br />in conjunction with the site development. GTE's engineering <br />will begin when th.ey are n4tified of your construction <br />schedules and teiephone requirements. <br />If a rearrangement of existing cables on px�emises or on the <br />right-of-way is necessary, appropriate charges will be <br />estimated and GTE's Guaranty of Payment form will be <br />forwarded to you for your signature. Pri�r to commencement <br />of GTE's engineerinq for such rearrangemenC, a degosit will <br />be required. To insur2 timely telephone service, GTE <br />requests ninety (90) days lead time for enqineering, <br />procurement, and installation of cable and/or GTE's <br />equipment. <br />Plc�ase contact Michael Hupf, Senior Engineer, at 356-4052 <br />should you require additior.al intorination. <br />C:\WORD\SEPA\SBPA7-93.DOC <br />