Laserfiche WebLink
Brand-Broadway/Silo <br />811 S.E. Everett Mall Way <br />Plan Check No. B-40879 <br />Page Two of Two <br />In order for the processing of your application to continue, it will be necessary to provide the <br />Building Division with two complete new sets of drawings reflecting the corrections requested. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure <br />that the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerel <br />e fr. 4. Mc all <br />Associate Engineer/Building <br />ISM:cg1p1anck(4 <br />