Laserfiche WebLink
� <br />EMOP IV PROJECT <br />JN: 31-� L01 <br />PRECQNSTRUCfION �fEEI':NG WI'fH CITY OF EVERETT PAGE 2 <br />14. The city uses liquid chlorine for testing the pipes to !he meters. A 3'snch water <br />mawr will not be accepted. It must be euher a 2 inch �r 4 inch metcr. Nothing <br />can be physically connected until it is [ested and purifiecl. <br />15. Bill Bruce (259-3800) is :he wntact person for specifications on fire standazds. <br />He is in charge of all backflow and inspection. <br />16. Deduct meters are not allowed, so the 1 ll2 inch deduct merer will have to be <br />eliminated. <br />17. The city will rclocate the fire hydrants and install U�e check valve. The tiansfer <br />will be by Sound U[ilitics. <br />18. Power conduit mns over the city easements will have to be fiber optic encased. <br />t9. Washingmn W'-xking did not get the sewer line capped and inspected. R& L <br />will contact hie Anuerson to expedite this work. <br />20. Gordon ':�Vitcher of the City of Everett approved having the grevel put down at <br />the temporacy luc a�id the ecology blocks put azound the lot edge, and wheel <br />stops placed. We will coordinate with Gordon for any addiHonal requirements <br />on Thursday. <br />WWR:ss <br />ec: Atrerdees <br />File <br />121091101qI0i.mlPihi� <br />