My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
830 SE EVERETT MALL WAY 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
830
>
830 SE EVERETT MALL WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:04:16 PM
Creation date
2/13/2017 8:50:25 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
830
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��Q��b�J/(//�/� � � � <br />DfC 13 �991 �..� JN: 31-3104 <br />_..�i T .................................. <br />EMOP 1�1@I� """•-- <br />EVERETT 5�1'Dtifia� <br />PRECONSTRUCTIQN MEETING WITH CITY OF EVERETT <br />WEDNESDAY, [dOVEMBER 6, 1991 <br />Present Cartoll Tollefson, Ciry of Everett <br />Alan Locke, Ciry of Everett <br />Bud Carlisle, Harmon and Associates <br />Dan Eggimann, R& L Enrerprises West II <br />Bill Rockweil, R& L Entecpnses West tI <br />1. Act III is planned to opened by November 1991. <br />2. The sire conditions were outtined for the city officials. <br />3. The public works departmenr wiil be responsible for inspecting all work up to 2 <br />feet outside of the building line. <br />4. The construction haul road will entec at the northwest comer of the si[e and go <br />down the westem edge of the property. <br />5. The temporary lot is expected to be used for approximarely six months. <br />6. Cartoll indicared that the city is not able to wash the streets anymore, so the <br />contracrors will be entirely responsible for cleaning thcir trucks before they <br />leave the site. <br />7. Cartoll indicated that FIazmon needs ro purchase a Code Standazd Book. <br />8. Erosion Fence: R& L can use T bar steel posts at six feet on center. If they <br />decide to use wood, it wili have to be at faur feet on center. The mesh can stop <br />at the bottom of ihe trench along the fence. <br />9. Temporary Siltation Pond: Cartoll indicated that he wants ro see the silt fence <br />extended back along [he south property line to wntain lhe sil[ pnnd area. He <br />also wants to see hay bales between the temporary pond and main pond. <br />10. Dan assured the inspectors that exposed rain leaders fram the Millsrone Building <br />will be drained propedy. <br />ll. Cazroll warned that the building department will require maximum paperwork <br />for what goes on underneath ti�c building: Therefore, the superintendent wiil <br />keep a detailed daily log. <br />l2. The city is requiring crushed ar sand gnly for bedding under PVC. <br />13. The city is requiring a double check assembty for 8" capable of Flowing 2 l/2 <br />(eet par second. Westem Utilities might have a double check valve. <br />
The URL can be used to link to this page
Your browser does not support the video tag.