Laserfiche WebLink
�� ..F� :� :�� •�� � . <br />G. Ot:ain Owner approval to proceed aRer tinish gradinq and before planting and <br />sodding aperations. <br />P aNT O ATIONS: <br />Stake tree locations and �osition plants according to spacing on plans. If ground position <br />is more than 1'-6" from plant position, consuft with Owner before proceeding. <br />Adjust plant locations as direded by Owner. <br />PLANTING PITS: <br />A. Dig pits for trees and shrubs. <br />1. Notify Owner immediately oi clay soil or other unusual detrimental candition.Pits <br />are required to be rough,not smooth. <br />2. Badcfill plantings with specified topsoil. <br />3. Piants are requfred to have poskive drainage away irom rootball. <br />4. Remove excess and unsuitable matenal excavated from plant holes and dispose <br />legally ott praject site. <br />5. Fertilize as speGfied. <br />B. Pits: <br />1. Tree Pits: 24' minimum depih and 6" deeper than rootball and / or root spread. <br />Minimum twice the rootball diameter (36" min.). <br />2. Shrub Pits: 18' minlmum depth and minimum twic� rootbatl diamete�. <br />3. Groundcover Pits: i2" minimum depih and 12" miriimum diameter. <br />4. Plants irom F'�ats: Minimum 4' x 4". <br />5. Plants from P�ts or Small FieW Clumps: Minlmum 8' x 8". <br />6. For plants C�mparabie in sfze to shrubs: Pits same as speafied for shrubs. <br />C. Backfil:. <br />1. Backfill wi4h specified mix, and compact. <br />2. Fertilize plants at the specified rate applied unitormly aruund circumference ot <br />root spread under a cover o( 2" of planting mix. <br />3. Stake and guy trees immediately arier planting as per standarcl detail. All <br />supports and trees shall stand vertical. <br />4. Plant shrubs and groundcover plants as spacing indicated in slraight, evenly <br />spaced rr,ws. <br />SODDING: <br />A. Soil Preparation: As with "Finish Grading' section. <br />B. Lay fresh sod with tight, staggered joinis in a running bond pattem. <br />C. !n sloped areas, lay sod up and down slope: Trim edges adjaceM to walks, c�urbs, <br />walls, atc., for neat, tight ht. Roliina: When mdial watenng har sattled out, in 24 to <br />48 f!ours, the sod shall be rolled diagonally with a 300-Ib. rollsr to hasten the bond <br />beriveen sod and topsoil bed. Roll as required to provide a firm bed for sod, free ot <br />depressions <br />D. After roliing, water sod thoroughly to 8"-19" depth. <br />E. R�pair any depressions which develop through guarentee period.] <br />8B048 PLA�TING AND SODDING 02480 - 5 <br />