My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
830 SE EVERETT MALL WAY 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
830
>
830 SE EVERETT MALL WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:04:16 PM
Creation date
2/13/2017 8:50:25 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
830
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., � . :: . •, <br />�AN-UP: <br />Remove all roots, rocks and debris from site, and sweep and wash spotlessly clean all <br />walks, pavement and steps. <br />PROVISIONAL REVIEW (Pyn h iMl• <br />A Review requested by Contractor at time of completion of all work required <br />under contract (including work from other seclions, if any). <br />B. Prior to request tor review of work, accomplish the fotlowing: <br />1. Complete ail work including balancing, ad�usting the system <br />(pressure-reducing valves, ilow-ad�ustment keys, nozzles, etc.) to <br />provide optimum coverage without fogging. <br />2. Complete the operations and maintenance manual ready tor review by <br />Landscape Archfted, and record zones on inside controller face. <br />3. Complete sepia record drawing for review by Landscape Archited. <br />4. Obtain all miscellaneous keys, spare parts and tools reqwred under this <br />contract for review by Landscape Architect and delivery to Owner. <br />5. Clean out all sediment from valve boxes so that soil level is to boriom of <br />valve, and all wiring (including spare wire) is visible. <br />C. Coverage Check: Remove all vatve bo� covers and operate each zone ot the <br />system at direction ot Landscape Architect. <br />D. Correct any items noted on the punch list prior to request for Tinal inspection. <br />FINAL INSPEGTION / OWNER ORIENTATION: <br />At the time of and as part of the final inspection, conducl a trainin$ and orientation <br />session for the Owner covering the operation, ad�ustment and maintenance of the <br />irrigation system. The record drawings and operations and main;enance manual shall <br />be reviewed and all features explained.The Contractor shall no;ify the Owner jp �jp� <br />� week& prior to the training and onentation session. The date and time of the session <br />shall be subject to approval of the Owner. <br />END OF SECTION 02441 <br />88048 iflF�GATION 02441 - 1 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.