Laserfiche WebLink
ENViRONMENTAL EVALUATION <br />Routine environmental evaluatiun is required if a PCS broadband/cellular facility <br />with building mounted antennas has a total power �f all channels in any given <br />sector greater than 2,OOOW ERP (PCS)! 1,OOOW ERP (cellular) as referenced in <br />"Table 2 Transmiriers, Facilities and Operations subject to Routine <br />environmentai Evaluation" of Builetin 65. For the proposed facility, the total <br />power in any given secior is less than 2,OOOW ERP (PCS) 8� 1,OOOW (cellular); <br />therefore, the WCF is cstegorically exempt from requirement for routine <br />environmental processing. <br />FCC COMPLIANCE <br />The general po�sulation/uncontrolled exposure near the buiiding, inciuding <br />persons at ground level, surrounding properties, inside and on existing structures <br />will have RF exposure much lower than the "worst case" scenario, which is a <br />small fraction of the MPE limit. <br />Only trained persons will be allowed to access the rooftop for maintenanca <br />operations. AT&T and/or its coniractors will provide training to make the <br />employees fully aware of the potential for RF exposure occupational training and <br />they can exercise control over their exposure that is withi� the <br />occupational/controlled limits. <br />CONCLUSIONS <br />Based on calculations, the proposed WCF will comply with current FCC and <br />county guidelines for human exposure to radiofrequency electromagnetic fields. <br />All representations contained herein are true to the besk of my knowledge. <br />EXHIBITS <br />. MPE Calculations <br />. Antenna Spec Sheets <br />. RF Data Sheet <br />. WCF Location Map <br />