Laserfiche WebLink
i <br />I <br />t <br />DESChIPTION QF PAOPOSP.L <br />FTW�:T� DECI.AI2ATION OF NON-SIGNII'ICANCE <br />The pzopooed action ia the isnuance oE the grqding end buildii�g permit.s to qllow Cha <br />conetruckion of Khrea two-etary ofEice buildinga o£ approximate].y 50�676 equttre �eat <br />and another o�iice building with approxim4tel;r 23�288 squdre �eet� total yroes ec�uate <br />lootaq� ai approximately 175,378. The lollowing Eactoxa Were coneidere8 qnd the <br />lieted requiremente ware placed in resoonse to aoa�c9ents submitted bx Naz�ious Cit;� <br />departments during their review of Rn Envirocuqental Checklist �or this �rq�osalt <br />� ;I � ' ' t �� �� , . <br />1, A detailed drawing s!iall be sub�itted to the: Pvblic Works Depa;tment shqWing l�;�out� <br />landecapinq, driveways, stornt dr�inage� and all required improvements tq �he Rubli:: <br />• ftight-of-�Way.�•Public Works De?:rtm�nt apprqVal o� these drawinga ie rec�uired begoze <br />any permits are issued. A11 impeoveatenta eh�ll ba completed be�o7ce thd Occu�anex Pern�it <br />is issued. ! ` <br />2. Covenant. dower of Attarney for sireet imPraVements to 100th Stxeet� to South B=oadwaX� <br />'and to a future North-South cortidor from 100tk� $treet to South Brqadway cr. the eaetern side <br />of the proposed site by L.I.D. is required. ' <br />3. A 35 foot strip of land on the east postion oE subject site aha,ll be �rqyidad in a <br />;ecordcd documant Eor the purpose of. conatruct�nq a North�Squth corridoz betWeen lOOth <br />�Streat and South Broadway. Method nf prq�.i,3i.ng corr3dor shall.be dg�Xoyad b� CitX <br />Attorney. Satback requirsmenta for ;.::ie potential future Right-of-Way muet be met. <br />4. Participation in tha program to fund the Suuth End Sani'cary Sewer Interceptor is <br />iequired, ' , . <br />5. On-site detention with provision for oil removal is required. Draina9e calculations <br />are to be submitted with the attached cover uheet. • <br />Public.Works Department aoproval of a temporary erosion control pl;�n is required prior <br />� W commencinq site preparatio::. <br />6. Durinq construction all truck traffic to and from the site within the City of Everett <br />shall be on arterial streets unless otnerwise approved by the Public Works Uepartment. <br />City stxeets are to be kept clear of dirt and debria during construction. <br />i , <br />7. Aevieiona in tha Auqust 29, 197': r_eiirninary site plan must be ra•rieNed an� L <br />approved by the Planni.ng Departmenx � z:or to tha iasuance of any permita, f� ((,;��.f,,,, � <br />i <br />8. A fire hydrant is required within 30q feet of all buil.di7l�a. <br />A loaped water main of sufficient size to provide 4500 G,g.M. and hydranL(s) must be <br />provided in confornwice with the t:iL•y Fi,r.e Departmenb requi�ements. <br />, _ <br />�, . ' PROPONENT � �. IACATIOl1 OF PROPOSAL <br />Olympic Groug Everett Ma:Ll Business Park S. <br />Canal Park 8uildinq South of South 8roadway and West <br />�36 Etruria of Seattle Pira� Bank <br />I Sealtle, WA 98109 <br />� <br />Isid A4ency: City of Everett Planning Department '—'----- <br />Contact Person: Bob Landles <br />Phone: 259-8731 <br />� <br />This proposal has been determined not to have a sifnificant adverse impact on the environment. <br />, An Envir.onmental Impact Statement is not required under RCW 93.21C.030(2)(c). This decision <br />wEs made after review by the lead agency of a corttpleted environmental checklist and other <br />info,�ration on file with the lead agency. This DeclaraCion of Non-Significanae is specifically <br />conditioned on compli�nce with tiie conditions attached hereto which are incorporated �y referen <br />as if fully set forth herein. <br />A fiftean day review period has elapsed for this project and no adverse comments were received. <br />Responsfbt.e Official: <br />Title: <br />�r <br />Dennis Derickcon <br />Planninq Director <br />Receipt No. �37737 <br />Date: November 8, 19'i9 File No. 79-107 <br />� � <br />Signature: . <br />NOTE:. This�rfinal Dec aration of Non-Signi.ficance may be witlidrawn �� the event of significant <br />changes in this proposal, or failure to comply wich the conditions unon which this Declaration <br />of Non-Significance is predicated. • <br />