My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
906 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
906
>
BASE FILE
>
906 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:23:10 PM
Creation date
2/13/2017 8:51:27 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
906
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />April 9, 1987 <br />Larry Ca].lahan <br />Ben F.dwards <br />Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: Everett Ma11 Office Park <br />Buildino C <br />Dear Larry and Ben: <br />`f'4=.)` x°�.�SRti.:. <br />� <br />r'.?? 1 ,^, i987 <br />CIIY OF EVERE� <br />Pub:ic Works Dep;. <br />�_� <br />GABBERT <br />BROWELEIT <br />PETERSON <br />ARCHI'�CiS PS, <br />11000 i.aKE Cli`! WY, NE <br />SEATfLE <br />WASHWGTON 9b125 <br />(205) 35' 3600 <br />MARGIN J. GAB@ERi <br />FRWCIPAL AIA <br />LARRY i. 3ROWELEIT <br />FRINC�PAL AIP, <br />DAVID A. PETEkSON <br />PRIfvCIPAL AIA <br />The fcllowing items were discussed and resolved during our <br />meeting April 8, 1987: <br />1. Mechanical sha11 submit energy calculation, equipment load <br />and the genera7. layout at the time of filing for permit. <br />The tenant improvements wi17. not be required. <br />�? <br />3. <br />4. <br />Architectural shall submit code date based on U.B.C., 1985 <br />Cdition and drawings at the time of filing for permit. <br />Structural shall include structural calculation along wit5 <br />the drawing at the :.ime of filing for permit. <br />Electrical shall show emergancy path lighting and exit sign <br />locations rind a panel schedul.e when filing for permit. The <br />tenant .iinprovenient will not be requi.red. <br />5. The Owner, 1979 Olympic Investors (Harmon & Associates Real <br />Estate, It:c.) shall �ile a no—build easement along the east <br />property lirt� in tne area of the new building to ensure the <br />40 foot separation that is required by code. This will <br />allow the Type II, 1 hour b�ilding to be non—sprinklered and <br />have 72,000 s,f. This easement must be filed prior to <br />i�suing the building permit. <br />G. It was also clarified that The Planning Department, Mary <br />Cunningham, wi11 allow shar.ed parking between the individual <br />patcel oE land within Everett Mall Office Park. <br />7. The e].evator shaft must be 1 hour with a 1 hour door at each <br />penetration. The elevator does not require a smoke proof <br />vesi_i.bule and the shaft doesn't have to be pressurized but <br />it must Ue vented per U.B.C., Chapter 51, <br />8. The bnilding shall be designed to compl; with Washington <br />State Rules and regulations Eor BARRIER FRF.E: DESIGN. <br />
The URL can be used to link to this page
Your browser does not support the video tag.