Laserfiche WebLink
.-. <br />ii. Coordinated i.nternal circulatton for both cars and ' <br />pedeatrians to provide for a more efficient flow of <br />traffic between existing office buildinga and <br />adjoining properties and streets. �, <br />iii. Usable opeu space which provides paeaive � <br />r.ecreational space for employees and creates a more �i <br />sociable environment, such as a plaza or courtyard. <br />iv. An overall master plan that incorporates additional <br />property which appears to be ready for I <br />redevelopment in the near future, such as the <br />lumber storage area located west of Building C. <br />v. Increase in landsr.aping creating a pleaeing <br />� environment and separation from adjacent asea, i.e. <br />Dairy Queen, etc. <br />i <br />�° I <br />be , <br />to ! <br />b. Conclusion: Granting of this variance is necessary <br />preserve the right of the applicant that would <br />availaUle to him if the zoning code had been revised <br />meet the intent of the Comprehensive General Plan. <br />Cr3terion No. 3: That the authorization of auch variance wil.l not be <br />materially detrimental to the publi.c welfare or lnjurious <br />to property in the vicinity or 2oue in which the prope��ty <br />is located. <br />a. Finding: The proposed building is surrounded on all i <br />sides by commercial property, the majority of which is I <br />owned or under �ption by the applicant, and there will be � <br />no view obstruction. The additional height will caet a' <br />slightly longer shadoe�; however, the area shaded will be i <br />' parking lot or landscaped area. � <br />The applicant is providing parking in a greater amount <br />than required by the zoning code. <br />T.he Fire Department has commeated that in this area they i <br />have a difficult time in providing adequate fire <br />protection for buildings over four storiee in height I <br />aince the aerial ladder truck which serves this area ia il <br />only 65 feet 1❑ height. They oppoae construcr.ion of l <br />buildings over four stories in height unless they comply : <br />with the requirementa for high rise structures that� <br />require a high level of fire reaistiveness in ; <br />construction and mnny systemic protections, including � <br />aprinklers, detection systema, communications, fire!, <br />pumps, etc. I <br />b. Conclusion: If the applicant is required to meet the UBC� <br />standards Eor high rise �tructures or provide other fire <br />safety methods that are approved by the City's Fi.re' Chief ; <br />in order to aseure adequate fire protection, the'i <br />authorization of this variance should not be materially', <br />detrimeatul to the public welfare or injurious to others ' <br />in the vicinity or zone. � <br />—3— <br />