My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
909 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
909
>
BASE FILE
>
909 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2019 7:43:49 AM
Creation date
2/13/2017 8:56:23 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
909
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />(19) Recreation. Will the proposal result in an impact upon <br />• the quality or quantity of existing recreational <br />opportunities? � <br />i <br />e <br />no <br />the Quali <br />Yes Maybe No <br />_ ! X <br />mtity of existi <br />ite. — <br />(20) Archeolo ical/Historical. 4lill the proposal result in an <br />a teration of a significant archeological or historical X <br />site, structure, object or building? — — - <br />Explanation: To the best of our kno��led e and belief there are no signifi- <br />cant archeolo ica or historical structures or� objects on or under the site� <br />.therefore, this. ro'ect wi 1 not result in the disru tion of same. <br />III. SIGNATURE <br />I, the undersigned, state that to the best of my kno�•iledye the above information is <br />true and complete. It is understood that the lead agency nay �iithdraw any declara- <br />tion of nonsignificance that it may issue upon this checY.list should there be any <br />misrepresentation or lack of full disclosure on my part. <br />H. M. & C0. INC. P.S., <br />agent for Diagonal Way <br />� Development Company, Ltd. <br />9�/ r � <br />. � .__. <br />. Proponent: �'��j�v�{'�� <br />IV. DECLARATION OF RESPO'4SIBLE OFFICIAL: <br />The above-described project is a major action eiith (:i9nificant, insignificant) <br />impact and (�aill, �aill not) require an Environmental Impact Statement. <br />0 <br />Responsible Officia <br />
The URL can be used to link to this page
Your browser does not support the video tag.