Laserfiche WebLink
BUSH, ROGD & HITCHINGS, INC. <br />E3 H Civil Engineers and Land Surveyors <br />November 24, 2004 <br />Mr. Paul McKee <br />City of Everett <br />Engineering/Public Services Department <br />3200 Cedar Street <br />Everett, WA 98036 <br />Re: Madison Development <br />Plan Review <br />Dear Mr. McKee: <br />Please find our response to your `Plan Review Comments' dated October 29, 2004 below. You will <br />find the changes in itemized format addressing each comment per drawing page. I have also clouded <br />and called out the changes for this revision on CAD: <br />Sheet C1 <br />I. Notes have been changed to reflect the most current and relevant information pertaining to the <br />project. <br />Sheet C2 <br />I. Construction entrance shifted approximately 5A. to the south to aid in access to `Java Hut. <br />Sheet C3 <br />1. Catch Basins to be removed indicated as such. <br />2. Grading have been updated by civil to reflect new site layout. <br />Sheet C4 <br />1. Catch basins to be removed indicated as such.. <br />2. Regarding storm, water, and sewer notes, all have been updated to reflect any modifications or <br />changes to the plans. Standard City Plan numbers have been added where applicable. <br />3. Domestic service to existing Dairy Queen abandoned. <br />4. Water meter (for the new domestic line) added for the new retail building in landscaping planter <br />located on the west portion of the property. <br />5. To address `2.5'.allowable bumper over hang,' curbs were moved out 2.5. Site layout updated <br />(by the architect) to reflect this. <br />6. Client has decided not to install fire sprinklers in the retail building. According to codes, there is <br />no requirement for installation of fire sprinklers in our building. <br />2009 Minor Accnuc East, Seattle, Washington 98102-3513 - Phone 206/3234144; Fax 206/323-7135 <br />1-800-935-0508 Internet: brhine.com <br />