My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
910 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
910
>
BASE FILE
>
910 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 9:08:50 AM
Creation date
2/13/2017 9:04:12 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
910
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />Mr. Paul McKee <br />November 24, 2004 <br />Page 2 of 2 <br />BUSH. ROED & HITCHINGS, INC. <br />7. Easement exists that is 30' wide which gives City the right to install a water line at the west <br />portion of the project per Brad's (Madison Development's attorney) conversation with you on <br />November 24", 2004. <br />8. Surface water Management quality vault has been increased to a 4-cartridge (deep) structure as <br />the cartridge (low rate was decreased from 15 to 7.5GPM. According to Jane Zimmerman's <br />11/16/04 email, 4 cartridge is acceptable even though the calculations specify 4.01 cartridges. <br />System has also been updated to ensure minimal storm water backup in the structure. <br />9. Grease interceptor removed per client's request as no food service will be occupying retail <br />spaces. <br />10. Conveyance pipes changed from 12" to 8" onsite. <br />11. Existing CB on the southwest portion of project, to remain. Structure is large enough to <br />accommodate an additional pipe. We are replacing an existing 12"� pipe with an 8"a. In <br />addition, we are installing another new 8"� pipe on the side of the structure with currently no <br />pipe. <br />Sheet C5 <br />I. City standard reference numbers added to details where applicable. <br />Drainage Calculations <br />• Details for water quality vault updated for 4-cartridge (deep) structure. Structure sized for all <br />runoff on site except for the retail building and the area behind the building which are non - <br />pollution generating and routed around the water quality vault. <br />• Area of non -pollution generating rooftop updated to be 0.19 acres. <br />• Conveyance calculations added and updated per new design <br />• Peak flow for 6-month storm determined. Input parameters and results are included in report. <br />• CB Storm Filter sizing updated using capacity of 7.5 gpm/cartridge. <br />• Storm Filter data updated. This results in the use of a 4-cartridge structure instead of 2 cartridge. <br />Please give me a call if I may clarify any of the issues above. <br />Sincerely, <br />BUSH, ROED & HITCHINGS, INC. <br />d. <br />onald G. Golly, P.E. <br />President <br />
The URL can be used to link to this page
Your browser does not support the video tag.