My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/07/13 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/07/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 9:24:16 AM
Creation date
2/13/2017 9:23:51 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> CHANGE ORDER NUMBER 1 <br /> CONSTRUCTION MANAGEMENT ASSISTANCE <br /> FOR PHASE A FACILITIES FOR UPGRADE OF THE EVERETT WATER POLLUTION <br /> CONTROL FACILITY (WPCF) <br /> EXHIBIT A <br /> SCOPE OF WORK <br /> Planned engineering services to be performed in accordance with Article 8 of the Agreement comprise and <br /> are limited to those specifically set forth in this exhibit.These services are for the construction management <br /> assistance work associated with the Project,as described herein. The Scope of Work for this Project assumes <br /> that all construction activities will occur on the existing EWPCF site. It is also based on the assumption that. <br /> the City has hired a Construction Contractor(General Contractor/Construction Manager-GC/CM)under a <br /> separate Agreement with the City. This Construction Contractor will participate with Brown and Caldwell <br /> for aspects of the scope of work as defined in this Change Order Number 1. <br /> The specific elements of the work in this Change Order Number 1 are subdivided into the following tasks: <br /> Task Title <br /> Task 610 Submittal Review <br /> Task 620 Change Order Preparation <br /> Task 630 Miscellaneous Office Engineering <br /> Task 640 General On-Site Field Services <br /> Task 641 On-Site Geotechnical Inspections <br /> Task 650 Materials Testing <br /> Task 660 Operations and Maintenance Manual <br /> Task 670 Startup Services <br /> Task 680 As-Built Documentation <br /> Task 690 Project Management <br /> Task 699 Unanticipated Services <br /> OVERVIEW OF DESIGN WORK <br /> The design work has been completed with participation by the City and the City's designated GC/CM <br /> contractor. City staff and staff from the GC/CM contractor have participated in regularly scheduled <br /> meetings during the course of design to provide input to the design process. Decisions,discussions,and <br /> information to be transferred have been documented. The GC/CM contractor has lead efforts to develop <br /> Page 1 <br /> P:\24945 Everett WPCF\710 Project Management\01 Contract Docs\Change Order Number 1-CM\ExhibitA-Scope of <br /> Work Change Order 1 CM ver 1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.