Laserfiche WebLink
`$ <br /> Task 660. Operations and Maintenance Manual <br /> Objective. To provide an operations and maintenance manual describing system startup procedures, <br /> shutdown procedures, normal system operating conditions and procedural maintenance required for proper <br /> system operations. <br /> Approach. The Consultant will prepare an O&M Manual describing the operations of only the new or <br /> modified facilities for the Phase A EWPCF Project. Normal operations, emergency operations, and system <br /> controls and alarm conditions will be described. This O&M manual will be prepared in electronic format to <br /> be placed on a CD. Additionally, one paper copy of this document will be submitted. This document is to <br /> fit into the existing WPCF O&M manual structure. <br /> Products. The Consultant will provide a draft copy and a final copy of this O&M manual that incorporates <br /> City review comments. <br /> City Responsibilities. Provide review comments to the draft O&M Manual. <br /> Page 10 <br /> P:\24945 Everett WPCF\710 Project Management\01 Contract Docs\Change Order Number 1-CM\ExhibitA-Scope of <br /> Work Change Order 1 CM ver 1.doc <br /> 19 <br />