Laserfiche WebLink
Task 670. Startup Services <br /> Objective. Brown and Caldwell's staff and Subconsultants will provide hands-on,on-site assistance,and <br /> start-up services to facilitate the start-up of equipment and processes. Services in excess of those identified <br /> below will be conducted in accordance with the Agreement. <br /> Approach. On-site startup assistance will be provided for all elements of the system,including the <br /> arrangement and initiation of machinery/equipment warranties and beneficial use dates. This task is based <br /> on the assumption that the Contractor shall develop a complete testing and start-up procedures submittal in <br /> accordance with the Specifications for review by the Consultant. <br /> When requested by the City, the Consultant's staff shall serve as the Engineer's Witness for verifying testing <br /> results, but not for inspection or certification of installations. Inspections or certification of installations, <br /> whether for mechanical performance, for proper mechanical installation, or for structural integrity, shall be <br /> considered out of scope work under the terms of this Contract and, if requested by the City, shall be <br /> negotiated for equitable compensation as extra work under the provisions of this Agreement. <br /> After all submitted plans for an equipment item or system are accepted, the Consultant shall aid the City in <br /> verifying that equipment and system performance test requirements are met. The Consultant shall aid the <br /> City in ensuring that all systems are properly configured and valves are in proper positions to adequately test <br /> each piece of equipment and system. If a piece of equipment serves as back-up to another piece of <br /> equipment,the Consultant shall aid the City in identifying the proper system configuration and valve position <br /> for testing the equipment during back-up operations. <br /> The level of effort for the work in this task is embodied in the budget shown for this task in Exhibit B. If, <br /> during start-up activities, additional testing is required and the City requests the Consultant's assistance then <br /> the Consultant will negotiate reasonable additional fees under the provisions for extra work included in this <br /> Agreement. <br /> It is assumed that Systems Interface,Inc.will provide programming services to the General Contractor. This <br /> work activity will be deferred to the construction phase of the work and will not be part of this Agreement. <br /> Products. The marked-up original submittals,plans and/or schedules. <br /> City Responsibilities. The City shall review all plans and submittals for testing and commissioning of <br /> equipment,systems,and structures immediately upon receipt from the Consultant. The City shall inform the <br /> Consultant in writing of any specific comments that the City wants incorporated into the submittal mark-up <br /> within 7 calendar days upon receipt from the Consultant. <br /> • <br /> Page 11 <br /> P:\24945 Everett WPCF\710 Prject Management\01 Contract Docs\Change Order Number 1-CM\Exhibit A-Scope of <br /> Work Change Order 1 CM ver 1.doc <br />