My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/07/13 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/07/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 9:24:16 AM
Creation date
2/13/2017 9:23:51 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 699. Unanticipated Tasks <br /> Objective. The purpose of this task is to provide engineering services for activities that were not anticipated <br /> for this project at the time of writing and adoption of this scope. <br /> Approach. This task involves establishing a budget to provide additional work as requested by the City. <br /> The costs incurred for out of scope work conducted during the facilities planning and pre-design activities <br /> will be paid via authorizations from this task. Authorization to develop specific scope items and to utilize the <br /> budget contained in this task will be done only with written direction from the City. Since the actual scope of <br /> work for this task is unknown,an allowance is allotted for this task. This task also includes costs of <br /> approximately$31,000 to cover the out-of-scope work performed for the development of the Facilities Plan. <br /> Activities/Products. The Consultant shall provide a detailed scope of work description and budget for <br /> each unanticipated scope of work item identified in this task. The Consultant will then proceed with that <br /> scope item if and when written authorization is received from the City. <br /> City Responsibilities. The City shall provide written authorization to direct the Consultant for work in this <br /> task,and to use funds associated with this task. <br /> • <br /> Page 15 <br /> P:\24945 Everett WPCF\710 Project Management\01 Contract Doc.AChange Order Number 1-CM\Exhibit A-Scope of <br /> Work Change Order 1 CM ver 1.doc <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.