Jordan Construction ' JN 00284 <br /> July 25, 2000 Page 3 <br /> dense till. Based on this, it is our opinion the proposed residence r.an be constructed on <br /> conventional foundations, or on lean-mix (1 1/2 sack) concrete placed above these dense native <br /> soils. Overexcavation may be needed to reach the competent bearing material. <br /> Based on the location and elevation of the residential footprint, the existing rockery should not be <br /> impacted by the construction of this residence. The footprint of the residence is 30 feet from the <br /> top of the rockery at its closest point. No additional fill shouid be placed on the slope above the <br /> rockery. It is our opinion that the slope is stable and will remain so if no fill is placed on the slope. <br /> The proposec 30-foot setback from the rockery is adequate. <br /> The existing :eplic system within the proposed footprint of the residence will need to be removed. <br /> The depth and make up of the septic system is unknown. If the tank is located in the foundation <br /> areas, it should be removed and replaced with controlled density fill (CDF). <br /> The erosion c:ontrol measures needed during the site development will depend heavily on the <br /> weather condi:ions that are encountered. We anticipate that a silt fence will be needed around the <br /> downslope sid= of any cleared areas. Following rough grading, it may be necessary to muich or <br /> hydroseed bare areas that will not be immediately covered with landscaping or an impervious <br /> surface. <br /> Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the <br /> recommendations presented in this report are adequately addressed in the design. Such a plan <br /> review would be additional work beyond the current scope of work for this study, and it may include <br /> revision� to our recommendations to accommodate site, development, and geotechnical <br /> constraints that become more evident during the review process. <br /> We recommend including this report, in its entirety, in the project contract documents. This report <br /> should also be provided to any future property owners so they will be aware of our findings and <br /> recommendations. <br /> CONVENT/ONAL FOUNDATIONS <br /> The proposed structure can be supported on conventional continuous and spread footings bearing <br /> on undisturbed, dense, glaciafly deposited, gravelly, silty sand (glacial till) native soil, or on <br /> structural fill, or on lean-mix (1 1/2 sack) concrete placed on this competent, native soil. See the <br /> later sub-section entitied GENERAL EARTHWORK AND STRUCTURAL FILL for <br /> recommendations regarding the placement and compaction of structural fill beneath structures. <br /> Adequate compaction of structural fili should be verified with frequent density testing during fill <br /> placement. We recommend that continuous and individual spread footings have minimum widths <br /> of 12 and 16 inches, respectively. They should be bottomed at least 18 inches below the lowest <br /> I adjacent finish ground surface. The local building codes should be reviewed to determine if <br /> different footing widths or embedment depths are required. Footing subgrades must be cleaned of <br /> loose or disturbed soil prior to pouring concrete. Depending upon site and equipment constraints, <br /> this may require rem�ving the disturbed soil by hand. <br /> Depending on the finai site grades, some overexcavation may be required below the footings to <br /> expose competent, nalive soil. Unless lean concrete is used to fill an overexcavated hole, the <br /> overexcavation must be at least as wide at the bottom as the sum of the depth of the _ � <br /> �; !���% <br /> GFOTECH CONSULTANTS, INC. / � <br />