Laserfiche WebLink
Jordan Construction JN 00284 <br /> July 25, 2000 Page 6 <br /> to the above lateral soil pressures. lNhew sloping backfili is desired behind the walls, we will neec <br /> to be given the wall dimensio�s and the slope of the backfill in order to provide the appropriate <br /> design earth pressures. <br /> Heavy construction equipment should not be operated behind retaining walls, foundation walls, and <br /> existing rockeries, within a distance equal to the he�ght of a wall, unless the walls are designed for <br /> the additicnal lateral pressures resulting from the equipment. The wall design criteria assume that <br /> the backfill will be well-compacted in lifts no thicker than 12 inches. The compaction of backfill near <br /> the walls should be accomplished with hand-operated equipment to prevent the walis from being <br /> overloaded by the higher soil forces that occur during compaction. <br /> Retaininq Wall Backfill <br /> Backfill placed behind �etaining or foundation walls should be coarse, free-draining <br /> structural fill containing no organics. This backfill should contain no more than 5 percent silt <br /> or clay particles and have no gravel greater than 4 inches in diameter. The percentage of <br /> particles passing the No. 4 sieve should be between 25 and 70 percent. For increased <br /> protection, drainage composites should be placed along cut slope faces, and tl�e walls <br /> should be backfilled with pervious soil. <br /> The purpose of these backfill requirements is to ensure that the design criteria for a <br /> retaining wall are not exceeded because of a buiid-up of hydrostatic pressure behind the <br /> walL lhe top 1Z to 1S inches ot the backtfll should consist of a compacted, relatively <br /> impermeabie soil or topsoil, or the surface should be paved. The ground surface must also <br /> slope away from backfilled walls to reduce the potential for surface water to percolate into <br /> the backfill. The sub-section entitled PERMANENT FOUNDATION AND RETAINING <br /> WALLS contains recommendations regarding the placement and compaction of structurai <br /> fill behind retaining and foundation walls. <br /> If moist conditions or some seepage through the walls are not acceptabie, waterproofing <br /> should be provided. This typically includes limiting cold-joints and wall penetrations, and <br /> using bentonite panels or membranes on the outside of the walls. Applying a thin coat of <br /> asph2lt emulsion is not considered waterproofing, but wiil only help to prevent moisture, <br /> generated from water vapor or capillary action, from seeping through the concrete. <br /> EXCAVATIONS AND SLOPES <br /> Excavation slopes should not exceed the limits specified in local, state, and national government <br /> safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically in <br /> unsaturated soil, if there are no indications of slope instability. Vertical cuts should nat be made <br /> near property boundaries or existing utilities and structures. Based upon Washington <br /> Administrative Code (WAC) 296, Part N, the soil type at the subject site would be ciassified as <br /> Type B. Therefore, temporary cut slopes greater than 4 feet in height cannot be excavated at an <br /> inclination steeper than 1:1 (Horizontal:Vertical), extending continuously between the top and the <br /> bottom of a cut. This recommendation is for the dense glacial tiil encountered approximately 6 to 7 <br /> feet below ?he existing grade. The soii type for the looser weathered and fill soils above the densP <br /> -j//�� % <br /> GEOTECH CONSULTANTS, INC. <br /> � _ <br />