Laserfiche WebLink
Washington State Department of Transportation Page 7 Six Year Transportation Improvement Program <br /> Agency Everett From 2004 to 2009 <br /> County No. 31 Hearing Date 6/25/03 <br /> City No. 420 Adoption Date 6/25/03 <br /> MPO PSRC Resolution No. <br /> Project Identification I 1 Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. <br /> i Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge To.e Federal Funding Local Agency <br /> Project R/W <br /> g gEnding Length Phase Federal Federal State 4th Required <br /> ad <br /> r <br /> F. Describe Work to be Done Improve- <br /> 1 2 E. Street/County MP or road- n NumberType Status Total Utility Project Start Fund I Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> q' II <br /> Class Number 3 li yp g Codes Phase (mrn/dd/yy, Code 1 Phase Code Funds Funds Funds (2004) (20051 (2.006 6th Type (MM/YY) <br /> Functional PriorityE. Beginning MP or - MP or roa 6 7 8 9 10 : 11 ' 12 13 1415 16 � 17 18 19 20 21 <br /> 19 4 2 phases in project 05 P 1.7 C PE 8/1/07 501 50 50 <br /> Local P CN 6/1/08 250! 250 250 Yes <br /> Street Upper Ridge&Lower Ridge Rd.street improvemt. T <br /> Constr. Upper Ridge,Lower Ridge,74th St.,76th St 0 <br /> Beverly Lane to 78th Street , <br /> I Design and construct street improvements 300 300 300 <br /> 19 1 1 phase in project 12 P ' 00 C CN I 5/1/04 240 240 40 40 40 120 No <br /> Local Traffic Signal Interconnect P I <br /> Traffic Various locations within City limits T ! I <br /> Signal Various streets to Various streets 0 <br /> Construct traffic signal interconnect Totals I 240 240 401 40 40 120 <br /> 19 2 2 phases in project 12 S 00 C PE ' 1/1/04 I ' <br /> Local Traffic Signal Improvements(City-wide) P CN I 6/1/04 900 900 150! 150 150 450 <br /> Traffic Various locations within City limits I T <br /> Signal - Various streets to Various streets <br /> :Design,construct,install traffic signals Totals 900 900 150 150 150 450 <br /> 19 3 1 2 phases in project 12 P 0 0 PE ' 1/1/05 STP(U) 500 100 600 600 CE <br /> Local IITMS Upgrades CN 4/1/06 STP(U) 870 130 1,000 500 500 No <br /> Traffic various locations city-wide <br /> Signal various traffic signals in Everett <br /> „replace central system with„TMS compel.System Totals 1,370 230 1,600 600 500 500 <br /> 19 1 ! 2 phases in project 6 S 00 C PE 1/1/04 1 <br /> Local Neighborhood Block Grants P CN , 9/1/04 CDBG 360 360 60 60 60 180 No <br /> Neighbor. Various locations within City limits T <br /> Projects Various streets to Various streets I 0 <br /> ,Construct improvements in various neighborhoods Totals 1 360 360 60 60 60 180 <br /> 19 2 I 2 phases in project 6 P i 00 C PE 1 1/1/04 I <br /> Local Neighborhood Traffic Mitigation Studies-Projects P CN 1 5/1/04 j 2,400 2,400 400 400 400 1,200 <br /> Neighbor. Various locations within City limits T I <br /> Projects Various streets <br /> 0 <br /> j l�Install traffic enhancements in Neighborhoods Totals 2,400 2,400 400 400 400 1,200 <br /> 19 1 2 phases in prject <br /> 06 S 00 P PE 3/1/04 i 30 30 5 5 5 15 <br /> Local I 0 CN 7/1/04 150 150 25 25 25 75 <br /> Landscap. City Entryway Landscaping and Signs <br /> i Various Entryway Corridors within City limits <br /> Various Entryway to Various Entryway <br /> Design and Install Gateway landscaping and signs Totals 180 180 30 30 30 90 <br /> 19 1 3 phases in project 32 S 2 P PE 8/1/99 CMAQ 27 9 36 <br /> Local Interurban Trail North Extension CN I 7/1/04 CMAQ 714 238 952 5001 CE No <br /> Non- Interurban-PUD right of <br /> Madison <br /> Motorized Design andeet to 44th construct bicycle clel-pedestrian path I Totals 741 247 <br /> 9 way <br /> 1 988 500 <br /> Y <br />