Laserfiche WebLink
Washington State Department of Transportation Page 8 Six Year Transportation Improvement Program <br /> Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN From 2004 to 2009 <br /> County No. 31 Hearing Date 6/25/03 <br /> City No. 420 Adoption Date 6/25/03 <br /> MPO PSRC Resolution No. <br /> Project Identification IProject Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. I I Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. I Federal Funding Local Agency <br /> Project I RNV <br /> Func- D. Street/County <br /> Road Name or Number Improver' ' Phase Federal Federal' State 4th Required <br /> tional 'Priority E. Beginning MP or road-Ending MP or roac ment Total ' Utility Project Start Fund Cost by Fund Slate Local i Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status, Length Codes Phase (mm/dd/yy Code 1 Phase Code i Funds Funds ; Funds (2004) (2005) (2006) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 15 16 17 18 19 20 21 <br /> 19 2 P(E)-EN94(014) 3 stages in project 0 CN ' 5/1/02 675 110! 785 300 300 No <br /> Local i East Everett Pedestrian Walkway 1 I I I <br /> Non- 1 I <br /> Motorized I Pacitic Ave.,E.Grand Ave.,E.Marine View Drive <br /> Pacific Ave./Smith Ave. To North Broadway <br /> Design and construct bicycle-pedestrian path iTotals 759 131 890 335 3351 <br /> 19 3 2 phases in project 32 S 0.15 • P PE 4/1/02 I PSMP 15 71 22 CE <br /> Local 0 CN 9/1/03 PSMP 65 15 80 80 No <br /> Non- • 10th Street Pedestrian Improvements C <br /> 10th Street : T <br /> Motorized Eat Marine View Drive to Pine Street W <br /> Design and construct sidewalk improvements • S Totals <br /> 80 22 102 80 <br /> 19 4 T STPE-EN94(013) 1 phase in project 32 S 0.10 ' CN 5/1/04 STP(E)1 400! 100 500 500 EA No <br /> Local <br /> Non- Riverfront Walkway Overcrossing <br /> Motorized 1 Riverfront Walkway <br /> BNSF Overcrossing at 41st St.Overcrossing <br /> I Construct pedestrian overcrossing of BNSF Railway Totals 400 100 500 500 <br /> 19 5 I STPE-0420(002) 1 phase in project 32 S 2 P CN 5/1/04 1 STP(E) 44 11 55 551 CE <br /> Local IO I No <br /> Non- I Riverfront Walkway Phase I <br /> Motorized Riverfront Walkway <br /> to <br /> :Construct bicycle-ped path abo Snohomish River RNeTotals 441 11 55 55 <br /> Overcrossing, <br /> 19 I 6 STP(E)-0420013 2 phases in project 32 S 0.42 P PE 9/1/03 701 70 140 100 40 CE <br /> Local Port of Everett is Lead Agency 0 CN 1 4/1/05 2801 280 560 560 No <br /> Non- 13th Street Bike/Pedestrian Improvements <br /> Motorized 13th Street <br /> West Marine View Driveto Waterfront ' <br /> ped.and construct bicycle- improvements Totals 350, 350 700 100 600 <br /> 19 7 3 phases in project 32 j S 0.3 C PE 4/1/02 STPE 30 20', 50 CE <br /> Local P RW 7/1/04 STPE 40 10' 50 50 Yes <br /> Non- Interurban Trail Completion T CN • 6/1/05 STPE 200 50 250 250 5/1/05 <br /> Motorized Colby Avenue 0 <br /> 44th Street to 41st Street <br /> I Design and construct bike&ped improvements ' Totals 270 80 350 50 250 <br /> 19 7 3 phases in project 32 S 0.3 C PE 7/1/04 200 200 50 150 <br /> Local P <br /> Non- 41st Street Connector T CN 7/1/06 1,500 1,500 500 1,000 <br /> Motorized 41st Street corridor 0 <br /> Interurban Trail to Riverfront Walkway I <br /> 1 <br /> Design and construct bike&ped improvements Totals I I 1700 1700 50 150 200 1,000 <br />