Laserfiche WebLink
Washington State Department of Transportation Page 9 Six Year Transportation Improvement Program <br /> Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN From 2004 to 2009 <br /> County No. 31 Hearing Date 6/25/03 <br /> City No. 420 Adoption Date 6/25/03 <br /> MPO PSRC Resolution No. <br /> I 'Project Identification I Project Costs in Thousands of Dollars Federally Funded <br /> ; A. Federal Aid No. IFund Source Information Expenditure Schedule Projects Only <br /> i B. Bridge No. 1 Federal Funding Local Agency <br /> C. Project Title RNV <br /> Func- D. Street/County Road Name or Number 'ImprovePhase Federal Federal I State I I 4th Required <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase Start Fund Cost e Fund and dl dl 10 2nd 3rd thru Envir. Date <br /> ment Total UtilityProject <br /> tional PriorityE. Beginning MP or road-EndingMP or roac Yp g i (mMddlyy)' Code Phase i Code Funds Funds Funds (2004) (2005) (2006) 6th Type (MM/YY) <br /> 12 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 I 8 2 phases in project 32 P 0.3 C PE 4/1/02 STPE 15 15 30 <br /> Local Port of Everett is Lead Agency P CN 1 8/1/04 CMAQ 40 40 80 80 80 No <br /> Non- Terminal Avenue Improvements T <br /> Motorized Terminal Avenue 0 <br /> California Street to Bond Street <br /> Design and construct street&ped improvements Totals 551 55 110 0 801 <br /> 19 9 3 phases in project 31 S 0.45 C PE 1/1/04 DISCR. 350 100 450 3501 <br /> Local P RW 5/1/05 50 40 90 90 CE Yes <br /> Non- Henry M.Jackson Park Pedestrian Bridge T CN 7/1/06 1,600 560 2,160 1,160 1,000 <br /> Motorized 0 <br /> .East MarineView rive to Snohomish River <br /> I <br /> I DesigP <br /> n bike ed bridge to Port of Everett BP Totals 20001 700 2,700 350 90 1,160 1000 <br /> 19 1 10 2 phases in project] 32 S 0.42 P PE 4/1/05 ! 70 70 140 140 CE <br /> Local • Port of Everett is Lead Agency I 0 CN 4/1/06 280 280 560 560 No <br /> Non- Riverside Bus.Pk. Bike/Pedestrian Imprvmt. . <br /> Motorized Riverside Bus.Park Trail <br /> 19 11 Design end construct bicycle 2phasesrin project a 32 P 0.3 C Totals PE j 6/1/04 350 + 3251 <br /> East Marine View Drive to Jackson Ped Bridge <br /> 9 cy P700 _ 140 560 <br /> I p j25 25 175 <br /> Local Port of Everett is Lead Agency 0 CN 6/1/05 I I 175 175 <br /> Non- Port of Everett Public Access Walkway <br /> Motorized Port of Everett South Terminal-sewer easement 1 <br /> Bond Street to Pigeon Creek#1 <br /> Construct bike-ped trail Totals 200 200 25 175 <br /> 19 12 2 phases in project 32,8 S,P 0.2 0 PE 4/1/01 STP(E) 149 254 403 EA <br /> Local PE 4/1/06 CMAQ 318 1,000 1,318 1,319 No <br /> Non- 1-5/Snohomish River Bicycle-Ped Bridge CN 4/1/09 IAC 250 2,000 2250 2,250 <br /> Motorized IInterstate 5 CN 4/1/09 DISCR. 3,000 ALEA 783 1,246 5,029 5,029 <br /> East Marine View Drive to Langus Riv'ft.Park <br /> Design,cosniruct bike-ped bridge over Snohomish River Totals I 3467 1,033 4,246 9,000 1,319 7,279 <br /> 19 13 ' 3 phases in project 32 P 00 P PE 5/1/04 1201 120 1001 20 30 60 <br /> Local 0 RW i I <br /> Non- Everett Non-Motorized Transportation Projects) CN 9/1/05 1 1,0901 1090 i 2801 270 540 <br /> Motorized 1 Various locations within City Limits'(see below) <br /> Various Locations to Various Locations <br /> Design construct pad 8 Bike Paths 8 Bike lanes I I Totals 1210 1210 100 300 300 600 <br /> ' Candidate non-motorized improvements include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street, <br /> Bond Street,Lowell River Road,36th Street,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW, <br /> 93rd Street SW,Dom Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place, <br /> Cady Road,Fleming Street,75th Street,100th Street SW,and various shoreline public access projects <br />