|
Washington State Department of Transportation Page 1 Six Year Transportation Improvement Program
<br /> Agency Everett From 2004 to 2009
<br /> County No. 31 Hearing Date 6/25/03
<br /> City No. 420 Adoption Date 6/25/03
<br /> MPO PSRC Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only
<br /> C. Project Title Funding Local Agency
<br /> L --
<br /> B. Bridge No. Federal
<br /> R/W
<br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 41h Required
<br /> y BeginningEnding ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> FunctionalClas 'Priority F. De cri ie Work or road- MP or roac Type Status Length Codes Phase ((mm/dd/yy' Code . Phase Code Funds i Funds Funds (2004) (2005) (2006) 6th Type (MM/YY)
<br /> Class Number F. Describe to be Done
<br /> 1
<br /> 4 5 6 7 8 9 10 11 12 13 , 14 15 16 17 18 19. 20 21
<br /> 11 1 3 phases in project 4 S ' 5.6 0 PE 1/1/99 18,300 18,300 1,300 10,000 7,000
<br /> Interstate jvarious RW 11/1/04 20,000 20,000 10,000 10,000
<br /> 1-5 Median HOV Lanes and Auxiliary Lanes CN 5/1/06 IWSDOT!191,700 191,700 70,000 121,700
<br /> 1-5
<br /> SR 529(N.Broadway)to E.Marine View Drive I
<br /> Design and construct Median HOV and GP aux.lanes Totals 230,000 230,000 1,300 20,000 87,000 121,700
<br /> 11 2 3 phases in project 3 P 0.1 0 PE 7/1/03 Disc. 1,000 RTID 5,557 6,557 1,200 5,357
<br /> Interstate ,5/630 P RW 1/1/05 RTID 1,126 1,126 1,126 EA 11/1/05
<br /> 11-5/41st Street SE Interchange T CN Jul-06 RTID 30,913 30,913 5,913 25,000
<br /> 1-5,41st Street
<br /> 1-5 at 41st Street to 1-5 at 41st Street
<br /> Design and construct Interchange Improvements Totals 1,000 0 37,596 38,596 1,200 5,357 7,039 25,000
<br /> 11 3 3 phases in project 3 S 0.1 0 PE 1/1/99 2,547 252
<br /> Interstate 5/620 (Sound Transit is lead on project) , P RW 1/1/00 427 205 EA 6/1/04
<br /> 1-5/112th St.Direct Access HOV-P&R/Flyer Stop T CN 7/1/05 I 9,969 8,451 750
<br /> 1-5,112th Street SE 25,705 25,705
<br /> 'I-5/112th Street SE to 1-5/112th Street SE
<br /> !Design/Construct HOV Ramps,P&P Lot,Flyer Stop i Totals 25,705 25,705 2,974 10,426 8,451 750
<br /> 11 4 I 3 phases in project 1 3 P 1.1 0 PE 1/1/06 I RTID 7,653 7,653 2,476 5,177
<br /> Interstate I 1 RW 6/1/07 j RTID 2,460 2,460 2,460
<br /> I1-5/Downtown Everett Interchange Improvements CN 3/1/09 RTID 33,318 33,318 12,299
<br /> 1-5 at Pacific,Hewitt,Everett Avenues I
<br /> Pacific Avenue to Everett Avenue
<br /> •
<br /> Major reconfiguration of I-5 offramps for Downtown Totals
<br /> 43,431 43,431 2,476 19,936
<br /> 11 5 3 phases in project 1 P 0.1 0 PE 7/1/08 RTID 11,922 11,922 6,556
<br /> Interstate I I RW 1/1/10 RTID 3,990 3,990 0
<br /> 1-5/1001h Street SE HOV Access/undercrossing CN 1/1/11 RTID 51,811 51,811 0
<br /> 1-5,100th Street SE
<br /> SR 527 to South Everett Transit Center area
<br /> Design and construct HOV access/undercrossing Totals 67,723 67,723 6,556
<br /> 11 6 1 phase in project 31 P Plan 10/1/01 WSDOT 2,000 200 2,200 300 900 1,000
<br /> Interstate
<br /> 1-5 SnoCAP Action Plan
<br /> Interstate 5 and other State highways,connectors
<br /> 11-5,US2,SR 9,SR 524,SR 96,SR 528
<br /> Action Plan for improvements required Totals 2,000 200 2,200 300 900 1,000
<br /> 11 7 3 phases in project I 1 P 0.3 0 PE 1/1/08 WSDOT 1,000 1,000 2,000 2,000
<br /> Interstate RW 6/1/09 WSDOT 1,000 2,000 3,000 3,000
<br /> 1-5/Smith Island Freeway Interchange CN 7/1/10 WSDOT 8,000 12,000 20,000
<br /> 1-5 at 12th St.NE or other location on Smith Island
<br /> 12th St.NE,or other location north of 12th St.NE
<br /> Design and construct freeway interchange j Totals 10,000 15,000 ' 25,000 0 5,000
<br />
|