Laserfiche WebLink
Washington State Department of Transportation Page 2 Six Year Transportation Improvement Program <br /> Agency Everett From 2004 to 2009 <br /> County No. 31 Hearing Date 6/25/03 <br /> City No. 420 Adoption Date 6/25/03 <br /> MPO PSRC Resolution No. <br /> Project Identification I Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding I Local Agency <br /> C. Project Title R/W <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or roa ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class 'Number, F. Describe Work to be Done i Type Status Length Codes Phase (mm/dd/yy; Code Phase • Code Funds Funds Funds (2004) (2005) (2006) 6th Type (MM/YY) <br /> 1 2 3 f 4 5 I 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 11 8 3 phases in project I 3 P ! 0.3 0 PE 1/1/09 ( WSDOT 3,000 1,000 4,000 2,000 <br /> Interstate RW ! 6/1/10 WSDOT 1,500 500 2,000 11/1/11 <br /> '1-5/East Marine View Dr. Frwy.Interchange CN 6/1/12 IWSDOT 17,000 7,000 24,000 <br /> 1-5 at East Marine View Drive 1 FMSIB 5,000 5,000 <br /> 1-5®E.Marine View Dr. <br /> Add on and oft-ramp to and from the north Totals I 26,500 8,500 35,000 2,000 <br /> 14 1 4 phases in project 4 S 1.5 C PE 3/1/94 WSDOTI 140 3,379 3,519 <br /> Principal i P RW 7/1/98 5,045 5,045 <br /> Arterial 19th Avenue SE(SR 527)Improvements T CN 6/1/04 WSDOI 25,430 25,430 10,000 14,530 <br /> 19th Avenue SE(SR 527) 0 <br /> I 112th Street SE to 132nd Street SE <br /> Design and construct addit.lanes,signal improv.,etc. Totals 25,570 8,424 33,994 10,000 14,530 <br /> 14 2 3 phases in project 4 S 0.6 C PE 9/1/00 AIP 119 40 159 <br /> Principal P RW 10/1/01 AIP 255 85 340 <br /> Arterial I Evergreen Way Widening T CN 7/1/03 AIP 900 351 1251 951 300 <br /> I Evergreen <br /> ay-Rucker Avenue <br /> Street <br /> Designeet wideningfrom 5 to 7 lanes 0 Totals 1274 4761 1750 951 300 <br /> 9 <br /> 14 3 HP 1998(021) 4 phases in project 4 J 5,P 1.5 C PE ! 3/1/03 DEMO{ 500 468 968 700 EA <br /> Principal I P PE FAST 600 600 600 Yes <br /> Arterial I East Marine View Drive Improvements T RW ! 6/1/05 DEMO 592 2,008 2,600 26001 <br /> East Marine View Drive 0 CN 7/1/06 DEMO ! 3,808 FMSIB 600 3,424 7,832 5,000 2,832 5/1/06 <br /> North Broadway to Interstate 5 I I <br /> Design,construct roadway widening and improvements Totals 5,500 600 6,500 12,000 1,300 2,600 5,000 2,832 <br /> 14 4 2 phases in project 3 S 0.2 C PE 10/1/00 TIA 45 22 67 <br /> Principal P CN 6/1/04 TIA 455 228 683 683 No <br /> Arterial Broadway/Beverly Blvd.Intersection Improv. T <br /> So.Broadway, Beverly Boulevard 0 <br /> Broadway at Beverly to SR 526 <br /> Design and construct intersection improvements Totals 500 250 750 6831 <br /> 14 . 5 I 2 phases in project 4 P 0.3 C PE 1/1/99 75 75 <br /> Principal P CN 7/1/08 TIA 225 200 425 425 <br /> Arterial Evergreen Way Widening I i T <br /> Evergreen Way 0 <br /> 11500 block to Airport Road <br /> Design,construct street widening/improvements i• I 225 275 500 425 <br /> 14 6 3 phases in Project 31 P 0 C PE 2/1/09 RTID 4,706 4,706 1,013 ' <br /> Principal P RW 2/1/11 RTID 1,324 1,324 <br /> Arterial Broadway Corridor Improvements T CN 6/1/13 RTID 27,244 27,244 <br /> Sou <br /> or <br /> Widen to Broadwaylanes <br /> to 41st Street <br /> wi h bike lanes0 <br /> SR 5 &sidewalks Totals 33,274 <br /> 33,274 1,013 <br />