|
Washington State Department of Transportation Page 2 Six Year Transportation Improvement Program
<br /> Agency Everett From 2004 to 2009
<br /> County No. 31 Hearing Date 6/25/03
<br /> City No. 420 Adoption Date 6/25/03
<br /> MPO PSRC Resolution No.
<br /> Project Identification I Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only
<br /> B. Bridge No. Federal Funding I Local Agency
<br /> C. Project Title R/W
<br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E. Beginning MP or road-Ending MP or roa ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class 'Number, F. Describe Work to be Done i Type Status Length Codes Phase (mm/dd/yy; Code Phase • Code Funds Funds Funds (2004) (2005) (2006) 6th Type (MM/YY)
<br /> 1 2 3 f 4 5 I 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 11 8 3 phases in project I 3 P ! 0.3 0 PE 1/1/09 ( WSDOT 3,000 1,000 4,000 2,000
<br /> Interstate RW ! 6/1/10 WSDOT 1,500 500 2,000 11/1/11
<br /> '1-5/East Marine View Dr. Frwy.Interchange CN 6/1/12 IWSDOT 17,000 7,000 24,000
<br /> 1-5 at East Marine View Drive 1 FMSIB 5,000 5,000
<br /> 1-5®E.Marine View Dr.
<br /> Add on and oft-ramp to and from the north Totals I 26,500 8,500 35,000 2,000
<br /> 14 1 4 phases in project 4 S 1.5 C PE 3/1/94 WSDOTI 140 3,379 3,519
<br /> Principal i P RW 7/1/98 5,045 5,045
<br /> Arterial 19th Avenue SE(SR 527)Improvements T CN 6/1/04 WSDOI 25,430 25,430 10,000 14,530
<br /> 19th Avenue SE(SR 527) 0
<br /> I 112th Street SE to 132nd Street SE
<br /> Design and construct addit.lanes,signal improv.,etc. Totals 25,570 8,424 33,994 10,000 14,530
<br /> 14 2 3 phases in project 4 S 0.6 C PE 9/1/00 AIP 119 40 159
<br /> Principal P RW 10/1/01 AIP 255 85 340
<br /> Arterial I Evergreen Way Widening T CN 7/1/03 AIP 900 351 1251 951 300
<br /> I Evergreen
<br /> ay-Rucker Avenue
<br /> Street
<br /> Designeet wideningfrom 5 to 7 lanes 0 Totals 1274 4761 1750 951 300
<br /> 9
<br /> 14 3 HP 1998(021) 4 phases in project 4 J 5,P 1.5 C PE ! 3/1/03 DEMO{ 500 468 968 700 EA
<br /> Principal I P PE FAST 600 600 600 Yes
<br /> Arterial I East Marine View Drive Improvements T RW ! 6/1/05 DEMO 592 2,008 2,600 26001
<br /> East Marine View Drive 0 CN 7/1/06 DEMO ! 3,808 FMSIB 600 3,424 7,832 5,000 2,832 5/1/06
<br /> North Broadway to Interstate 5 I I
<br /> Design,construct roadway widening and improvements Totals 5,500 600 6,500 12,000 1,300 2,600 5,000 2,832
<br /> 14 4 2 phases in project 3 S 0.2 C PE 10/1/00 TIA 45 22 67
<br /> Principal P CN 6/1/04 TIA 455 228 683 683 No
<br /> Arterial Broadway/Beverly Blvd.Intersection Improv. T
<br /> So.Broadway, Beverly Boulevard 0
<br /> Broadway at Beverly to SR 526
<br /> Design and construct intersection improvements Totals 500 250 750 6831
<br /> 14 . 5 I 2 phases in project 4 P 0.3 C PE 1/1/99 75 75
<br /> Principal P CN 7/1/08 TIA 225 200 425 425
<br /> Arterial Evergreen Way Widening I i T
<br /> Evergreen Way 0
<br /> 11500 block to Airport Road
<br /> Design,construct street widening/improvements i• I 225 275 500 425
<br /> 14 6 3 phases in Project 31 P 0 C PE 2/1/09 RTID 4,706 4,706 1,013 '
<br /> Principal P RW 2/1/11 RTID 1,324 1,324
<br /> Arterial Broadway Corridor Improvements T CN 6/1/13 RTID 27,244 27,244
<br /> Sou
<br /> or
<br /> Widen to Broadwaylanes
<br /> to 41st Street
<br /> wi h bike lanes0
<br /> SR 5 &sidewalks Totals 33,274
<br /> 33,274 1,013
<br />
|