Laserfiche WebLink
Washington State Department of Transportation Page 4 Six Year Transportation Improvement Program <br /> Agency Everett From 2004 to 2009 <br /> County No. 31 Hearing Date 6/25/03 <br /> City No. 420 Adoption Date 6/25/03 <br /> MPO PSRC Resolution No. <br /> Project Identification ! Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund d Source Information Expenditure Schedule Projects Only <br /> B. Project No..e 'Federal FundingLocal Agency - <br /> 9Fundr Cost b Required B. Bridge <br /> State � 4th Required <br /> FunctionalPrioriNumbe F. Describe Work to be Done Type <br /> MP or roac Type Status ttlCodes Phase Start mm/d Code Phase Code Fund dl dt 12nd 3rd thru Eyr. Date <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal <br /> H Beginning Ending Utility Project <br /> Length � d/yy;_. Code Funds Funds Funds (2004) (2005) (2006) 6th Type (MM/YY) <br /> 1 I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 16 5 HP-1998(015) 2 phases in project 1 S,P 1.1 S PE 9/1/01 1,000 1,000 1,000 <br /> Minor P CN 6/1/03 FMSIB 4,300 2,000 6,300 3,300 3,000 EA No <br /> Arterial Lowell Neighborhood Bypass <br /> Lowell Neighborhood Bypass <br /> 41st Street to Lowell River Road - <br /> Construct new minor arterial street Totals I � 4,300 3,000 7,300 1,000 3,300 3,000 <br /> 16 6 3 phases in project 4 P 0.9 C PE I 5/1/05 I TIA 360 120 480 480 <br /> Minor Joint project with Sno.County-(County Lead) P RW 7/1/06 TIA 387 129 516 516 <br /> Arterial 116th Street SE Improvements T CN 5/1/07 I TIA 2,060 744 2,804 2,804 <br /> 116th Street <br /> Design, <br /> sign,co struc h3 ane street e ith bike&pad improv. G Totals 2,807 993 3,800 480 516 2804 <br /> 16 7 2 phases in project 4 P 1 C PE 2/1/05 TIA 252 84 336 336 <br /> Minor P CN 6/1/06 TIA 1,660 604 2,264 2,264 <br /> Arterial 100th Street SW Improvements T <br /> 100th Street SW I 0 <br /> Airport Road to Evergreen Way I I <br /> Design,construct road widening 8 other improvements Totals 1,912 638 2,600 336 2,264 <br /> 16 8 3 phases in project 6 P 0.1 C PE 3/1/07 I , 75 75 75 <br /> MinorP RW 3/1/08 50 50 50 <br /> Arterial Casino Rd.at Hardeson Intersec.lmprov. T CN 5/1/09 375' 375 375 <br /> 1 Casino Rd./Hardeson Rd. W � <br /> :Intersection of Casino/Hardeson Rd. S <br /> Design,construct intersection improvements G Totals I 500' 500 0 500 1 <br /> 16 9 3 phases in project 0.5 C PE 1/1/06 RTID I 1,500 1,500 1,500 <br /> Minor Sno.Co.is lead agency P RW 1/1/07 RTID 2,000 2,000 2,000 <br /> Arterial 4th Avenue West Widening/Improvement T CN 5/1/08 RTID 5,500 5,500 5,500 <br /> 4th Avenue West W <br /> 112th Street SW to 104th St.SW S <br /> Design,construct street improvements G Totals 9,000 9,000 1,500 7,500 <br /> 16 10 2 phases in project 6 P 2 C PE 2/1/05 300 300 300 <br /> Minor P CN 5/1/07 2,700 2,700 2,700 <br /> Arterial Colby Avenue Streetscape Improvements T <br /> Colby Avenue W <br /> 19th Street to 41st Street S <br /> Design,construct streetscape improvements G Totals 3000 3000 300 2,700 <br /> 17 1 I 2 phases in project 32 S 1 C PE 4/1/02 CMAQ 2911 45 336 <br /> Collector I P RW 9/1/03 CMAQ 284 44 328 328 CE Yes <br /> Arterial Holly Drive Non-Motorized Improvements T CN 10/31/04 CMAQ 325 AIP 149! 462 936 936 <br /> Design and constructpedestrian improvements Totals ( , 1988, I 149 88 88 9/1/03 <br /> I 1,000 1,000 <br /> HOOth Streeolly Drive t SW Airtport Roadzed vements 0 CN STP(U) 1 000 <br /> g p I ' I; 5511 2688 328 2,024 <br />