Washington State Department of Transportation Page 3 Six Year Transportation Improvement Program
<br /> Agency Everett From 2004 to 2009
<br /> County No. 31 Hearing Date 6/25/03
<br /> City No. 420 Adoption Date 6/25/03
<br /> MPO PSRC Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. Fund Source Information _ __ Expenditure Schedule Projects Only
<br /> B. Bridge No. Federal Funding Local Agency_
<br /> C. Project Title
<br /> R/W
<br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E. Beginning MP or road-Ending MP or roa ment Total Utility Project Start Fund 'Cost by I Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number F. Describe Work to be Done 4 Type Status_Length Codes Phase (mm/dd/yy Code -Phase Code Funds Funds Funds (2004) (2005) (2006) 6th Type (MM/YY)
<br /> 1 I 2 i 3 4 i 5
<br /> I 6 7 8 9 10 11 12 13 14 I 15 16 17 18 19 20 21
<br /> 14 7 1 2 phases in project 12 S 00 ! C PE 1/1/05 STP(S) 135, 135 135 CE
<br /> Principal I P CN 3/1/06 STP(S) 765 I 765 765 No
<br /> Arterial 1 i(HES)Projects(Broadway/52nd St.;Forest Park Entr. T
<br /> So.Broadway at 52nd St.&at Madison St. 0
<br /> 'Entrances to Forest Park on Mukllteo Boulevard
<br /> Various safety,signal related improvements 1 Totals 900 900
<br /> 14 8 1 phase in Project 31 P 0 PE 2/1/04 200 200 200
<br /> Principal No
<br /> Arterial Arterial Needs Studies -
<br /> Various Arterials within City Limits
<br /> N/A to N/A 1
<br /> Study improvement needs-various classes of arterials Totals 200 200 200
<br /> 14 9 3 phases in project 3 P 0.3 0 PE 6/1/05 RTID 30,000 30,000 2,000 2,000 8,000
<br /> Principal 5/640 RW 6/1/10 RTID 50,000 50,000 EIS 3/1/12
<br /> Arterial US 2 Improvements CN 6/1/12 RTID 243,000 243,000
<br /> US 2 Improvements
<br /> I.5 and SR 204 -
<br /> Md lane each direction,improve interchanges Totals 323,000 323,000 2,000 2,000 8,000
<br /> 16 1 HP-1998(015) 3 phases in project 8 S 0.3 C PE 1/1/99 DEMO 1,120 280 1,400 500
<br /> Minor 1 P RW 9/30/99 DEMO PWTF 1,000 800 1,800 EA
<br /> Arterial I 141st Street Overcrossing T CN j 6/30/01 1 DISC 6,728 FMSIB 3,000 1,658 11,386 8,673 Yes
<br /> 141st Street 0 CN 6/30/01 STP(U)! 1,457 1,457
<br /> g site 9 S CN 6/30/01 STP(E)i 457 457 6/1/01
<br /> I-5 interchanged to Landfill project
<br /> W Totals 9,762 4,000 2,738 16,500 9,173
<br /> 'Design and construct railwayovercrossing
<br /> 2 3 phases in roject I 4 S 1 C PE 1/1/02 TIA 284 284 568
<br /> Minor P RW i 5/1/03 TIA 320 320 640 640
<br /> Arterial 112th Street SE Improvements T CN 6/30/04 TIA 1,936 1,936 3,872 3,872
<br /> 112th Street SE 0
<br /> 3rd Avenue SE to west side 1-5 R-O-W i S
<br /> Design,construct S lane street with bike 8 ped improv. W Totals 2,540 2,540 5,080 640 3,872
<br /> 16 3 2 phases in project 4 S 1 C PE 1/1/00 TIA 519 826 1,345 250
<br /> Minor P RW
<br /> Arterial 112th Street SE 1-5 bridge widening T CN 7/1/04 TIA 3,735 3,736 7,471 3,500 3,971
<br /> 112th Street SE 0
<br /> 112th Street SE at Interstate 5 S j
<br /> Design,construct 5 lane street with bike 8 ped improv. W Totals 4,254 4,562 8,816 250 3,500 3,971
<br /> 16 4 3 phases in project 4 S 1 C PE j 1/1/05 TIA 262 263 525 525
<br /> Minor i P RW 5/1/06 TIA 375 375 750 750
<br /> Arterial 112th Street SE Improvements T CN 5/1/07 TIA 1,112 1,113 2,225 2,225
<br /> 112th
<br /> et SE 0
<br /> Design,construct S lane street with sidewalk improv. W Totals I 1,749 1,751 3,500 525 7501
<br /> East side 1-5 R-O-W tp SR 527(19th Ave.SE) S 2,225
<br /> w
<br />
|