My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5345
>
Resolutions
>
Resolution 5345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2017 11:08:21 AM
Creation date
2/14/2017 11:08:20 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5345
Date
6/4/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7� <br /> RESOLUTION NO. 5345 <br /> A RESOLUTION PRELIMINARILY DETERMINING TO USE GENERAL <br /> CONTRACTOR/CONSTRUCTION MANAGER ALTERNATIVE PUBLIC WORKS PROCEDURE FOR <br /> CONSTRUCTION OF THE WATER POLLUTION CONTROL FACILITIES UPGRADE, SCHEDULE A <br /> WHEREAS,the City of Everett plans to upgrade its Water Pollution Control Facility; and <br /> WHEREAS,the Project includes construction of two primary clarifiers with sludge grit removal <br /> and scum dewatering systems, headworks grit system improvements,yard piping, biosolids <br /> storage and processing facilities, diversion structures, and other tasks as described as Project <br /> Schedule A in the EWPCF Facilities Plan and Basis of Design Report; and <br /> WHEREAS,the project cost estimate for Project Schedule A exceeds $25,000,000; and <br /> WHEREAS, RCW Chap. 39.10 authorizes the City of Everett to use alternative public works <br /> procedures in appropriate circumstances; and <br /> NOW, THEREFORE, THE CITY OF EVERETT CITY COUNCIL DOES RESOLVE: <br /> Section 1 Findings. <br /> City Council finds as follows: <br /> A. The Project involves construction at an existing facility that must continue to operate and <br /> meet environmental standards during construction. <br /> B. Scheduling, sequence, access, and construction methods and techniques will be complex. <br /> C. Early involvement and participation of the general contractor/construction manager <br /> ("GC/CM") during the design phase will allow constructability review and value <br /> engineering to occur during Project design,resulting in a substantial fiscal benefit to the <br /> City and will be critical to the success of the project. <br /> Section 2 Preliminary Determination. <br /> City Council preliminarily determines the use of the GC/CM alternative public works procedure <br /> of public works contracting serves the public interest and will be used for this Project, subject to <br /> public comment and final determination by this Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.