Laserfiche WebLink
7 <br /> Stormwater Technical Memorandum <br /> 8.1 Stormwater Technical Memorandum <br /> 30% PS&E <br /> 9.1 Technical Memorandum <br /> 9.2 30% Plans <br /> Cover Sheet—Vicinity Map <br /> Index, Notes and Symbols <br /> • Existing Site Conditions (with utilities) <br /> TESC Plan <br /> Demolition Plan <br /> Site Grading and Geometry Plan <br /> Geometry Tables— Survey and Grading Control Data <br /> Geometry Tables— Face of Curb Data <br /> Alignment Profiles <br /> Storm Drainage Plan <br /> Storm Drainage Profile <br /> Utilities Plan <br /> Paving Plan <br /> Paving Details <br /> Site Sections <br /> Channelization and Signing Plan <br /> 9.3 30% Outline Specification <br /> 9.4 30% Estimate <br /> 9.5 QA/QC <br /> 2. Paragraph 4(D) is modified to read as follows: <br /> Total compensation, including all services and expenses, shall not exceed a <br /> maximum of Two Hundred Sixty Two Thousand Three Hundred Eighty Seven <br /> Dollars ($262,387.00). <br /> 3. Time of Beginning and Completion of Performance. <br /> This Agreement shall commence as of the date of execution of this amendment and <br /> shall be completed by December 31, 2005. <br /> 4. The effective date of this Amendment is August 2, 2005. <br /> 5. All terms, conditions and provisions of the Agreement remain in full force and effect <br /> except as expressly modified by this Amendment, <br /> • <br /> S.\THingson'NETC-1NCAINCA PSA amendment!edit doc(Y17/15/1999) 19 <br />