Laserfiche WebLink
7 <br /> ATTACHMENT A-1 <br /> SCOPE OF SERVICES <br /> North Everett Transit Station 30% Design <br /> PROJECT INFORMATION <br /> The transit center will be designed to accommodate up to four articulated sixty-foot transit <br /> vehicles and two forty-foot vehicles on an off-street central platform. A kiss-and-ride area <br /> on the adjacent street will accommodate future expansion for an additional two sixty-foot <br /> articulated transit vehicles. The project will include accessible features, a driver <br /> comfort/ticketing building with water and sewer service, a security/surveillance system, <br /> storm drainage system, landscaping, and site lighting. This project will not change the <br /> existing grades of the adjacent street, Old Broadway. <br /> This 30% design work includes: preparing 30%Plans, Estimate and Outline Specifications; <br /> the Geotechnical Report; a Technical Hydraulics Memorandum; conducting agency and <br /> jurisdiction coordination; prepare for and assist in the community involvement; and pickup <br /> survey. COE will solicit a Lump Sum price for the 60%through Bid Documents and Bidding <br /> Assistance phase of the project from the Consultant at the end of this 30% phase. The project <br /> budget for the 30% design is$134,558. <br /> Everett Community College will construct a new building adjacent to the project site. The <br /> building is scheduled to be operational September 15, 2006. <br /> Based on a Notice to Proceed date of August 16, 2005, the 30% submittal can be delivered <br /> on October 14, 2005. <br /> 20 <br /> 30%SCOPE OF SERVICES, PAGE 1 OF 16 <br /> North Everett Transit Station <br /> July 29,2005 <br />