My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/10 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:14:08 AM
Creation date
2/15/2017 10:10:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> The Consultant shall prepare a Stormwater Technical Memorandum which will include the <br /> stormwater design criteria, calculation of 25-year conveyance volumes and an evaluation of <br /> the impacts of the proposed transit center to the existing downstream stormwater conveyance <br /> system. The existing downstream system will be evaluated from the project site to its <br /> confluence with a sewer main trunk in Waverley Avenue. <br /> TASK 9—30% PLANS, SPECIFICATION AND ESTIMATE <br /> Deliverables <br /> • Technical Memorandum <br /> • 30% PS&E (Three (3) copies with half-sized Plans) <br /> 9.1 Technical Memorandum. The Consultant shall prepare a Technical Memorandum <br /> which will summarize the design process in Phase 1 through which the Preferred <br /> Alternative was selected. It will discuss the four alternatives,the selection and <br /> development of an alternate to meet the Everett Community College Master Plan and <br /> finally, the selection of Alternate 4 as the Preferred Alternate. It will also include a <br /> discussion of appropriate wall types and include plates showing the location and height of <br /> the wall(s) as well as typical sections. <br /> The Consultant shall prepare the 30% set of Plans Specification and Estimate (PS&E) for ET <br /> and COE review. The building will be identical to the building designed for the Everett Mall <br /> Station, with minor external finish revisions. This work includes analyzing and sizing the <br /> stormwater conveyance system. The project will utilize standard shelters to be furnished <br /> separately by ET. The Consultant shall incorporate previous comments into the 30%PS&E <br /> The scope of work for this effort includes the following: <br /> 9.2 30%Plans. The Consultant will provide 30%Design Plans. A preliminary Plan list <br /> includes: <br /> Civil- Site <br /> I Cover Sheet—Vicinity Map <br /> 1 Index,Notes and Symbols <br /> 1 Existing Site Conditions (with utilities) <br /> 1 TESC Plan <br /> I Demolition Plan <br /> 1 Site Grading and Geometry Plan <br /> 1 Geometry Tables— Survey and Grading Control Data <br /> 1 Geometry Tables—Face of Curb Data <br /> I Alignment Profiles <br /> 1 Storm Drainage Plan <br /> 1 Storm Drainage Profile <br /> 1 Utilities Plan <br /> 1 Paving Plan <br /> 3`i 1 Paving Details <br /> 30%SCOPE OF SERVICES, PAGE 15 OF 16 <br /> North Everett Transit Station <br /> July 29,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.