My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/17 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:25:14 AM
Creation date
2/15/2017 10:24:49 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A J <br /> SCOPE OF WORK (CONTINUED) <br /> SCOPE OF WORK <br /> The following is a draft scope of work for this phase of the project. <br /> TASK 1 — PROJECT MANAGEMENT <br /> KPFF will manage the design team. This effort will include the following: <br /> • Administer and manage a multidisciplinary design team. <br /> • Project invoicing. <br /> • Arrange, attend, and prepare meeting notes for 4 project coordination meetings <br /> with the City of Everett. <br /> • Arrange and prepare meeting notes for 2 design workshops. <br /> • Track project progress and update project schedules. <br /> • Prepare project progress reports. <br /> • Prepare project design and construction schedule. <br /> TASK 2— DESIGN CRITERIA DOCUMENT <br /> KPFF will prepare the design criteria development based on contributions from a variety <br /> of disciplines, including structural and civil engineering: <br /> Civil design criteria that will be addressed in the basis of design will include: <br /> • Minimum trail widths and horizontal clearances criteria. <br /> • Horizontal geometry constraints (including minimum radii for curves) and <br /> allowable design speeds for bicycles. <br /> • Maximum allowable vertical grades and rates of curvature for both bridge <br /> structures and for access ramps. <br /> • Emergency access requirements. <br /> • Minimum lighting requirements. <br /> • BNSF railroad clear zone requirements for foundations and vertical clearances to <br /> bridge girders. <br /> • Requirements for stormwater detention and water quality. <br /> • Construction criteria within 100-year flood plain. <br /> • Utility clearance requirements. <br /> o Meet with utilities departments to discuss impact of the bridge on the adjacent <br /> pump station, sewer lines and water lines. <br /> 13 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.