My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/24 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:46:35 AM
Creation date
2/15/2017 10:45:56 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/24/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-2 <br /> 10 SCOPE OF WORK <br /> identification work that may be required for the different alternatives considered will also <br /> be evaluated. A memorandum will be prepared describing observed conditions. <br /> B. Consider the approximate extent of Permit Study revisions that may be needed for the <br /> various alternatives prior to the Alternatives/Constructibility Workshop. <br /> 1. Critical Areas Study and Habitat Management Plan Report. Identify the likely <br /> extent of revisions that may be required for the existing Critical Areas Study and <br /> Habitat Management Plan Report for the different alternatives considered. <br /> 2. JARPA/Biological Evaluation (BE). Identify the likely extent of revisions that may <br /> be required for the existing Biological Evaluation (BE) for the different alternatives <br /> considered. <br /> 3. Cultural Resources Investigation. Identify the likely extent of revisions that may be <br /> required for the existing Cultural Resources Investigation Report for the different <br /> alternatives considered. <br /> 4. SEPA Process. Identify the likely extent of revisions that may be required for the <br /> existing SEPA checklist and SEPA process for the different alternatives considered. <br /> 5. Permitting Acquisition/Schedule. Determine which permits may need to be <br /> extended and/or revised based on the various alternative design/construction <br /> approaches considered. Estimate time needed to acquire permits for the various <br /> alternatives considered. <br /> C. Develop Permit Revision Strategy and Tracking List for the selected alternative. Review <br /> the project's existing permits, schedule, and strategy with City staff. Prepare a summary <br /> list of permits, which identifies all required permits, summarizes likely permit revision <br /> requirements, and likely agency review periods for the required revisions. <br /> D. Miscellaneous Permitting Consultation and Agency Coordination Assistance. Provide <br /> initial Environmental/Permitting strategy assistance to the City prior to, during, and after <br /> the initial brainstorming meeting to identify alternative options to be considered. <br /> E. Meetings. Participate in an Alternatives Evaluation Selection Workshop after completion <br /> of the initial alternatives analysis. Environmental subconsultant shall also participate, via <br /> conference call, in two other meetings with City/MWH staff or regulatory agencies as <br /> required. <br /> Task 7. Undefined Services <br /> As it is difficult to accurately determine the nature of all features required for this project (e.g., <br /> design requirements of regulatory agencies, evolving permitting requirements, coordination <br /> issues with WSDOT, unanticipated land acquisition activities, etc.), a contingency fund <br /> MWH Page 7 EVERETT PHASE 6-Supplemental Agreement No 2 <br /> 8/5!05 36 EXHIBIT A-2—SCOPE OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.