My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/24 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:46:35 AM
Creation date
2/15/2017 10:45:56 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/24/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> Technical the Amended Permit and the Acceptance Standards, as reasonably determined <br /> inspected, and approved by the City. <br /> (g) Grading and--Compaction. The parties acknowledge that there is an <br /> L . - .. ...• . 1 1 _ • . .. - .. - - • - <br /> CSR AssociatedRinker shall complete reclamatio• : •_ . .. . - -. • • • <br /> Standards, attached-hereto as Exhibit C. CSR AssociatedRinker shall complete also agrees to <br /> provide rough grading e-on for the each Transfer Lots in accordance with City specifications in <br /> the Technical Acceptance Standards. <br /> (h) Roads. _ ' . '. -:Rinker and the City shall-jointly-developed developed an <br /> "Interim Access Plan"prior to the transfer of Lot 45-A and, if necessary,-shall jointly develop a <br /> "Final Access Plan," providing for access to and use of Lots 45-A, 45-B,and-45-C, 45-D and 45- <br /> E, prior to the completion of the frontage improvements described in Subsection 1.76(k). <br /> (i) Slopes. For a period of three (3) years after conveyance of the final <br /> Transfer Lot,i.e., Lot '15 EC, CSR AssociatedRinker expressly warrants the surface and <br /> subsurface stability of all slopes on each of the Transfer Lots. CSR AssociatedRinker shall not <br /> be responsible for sloughs or failures due to actions of the City or members of the public. CSR <br /> AssociatedRinker shall provide reasonable maintenance of the slopes of each of the Transfer <br /> Lots for the duration of this warranty period. Reasonable maintenance shall include repair of <br /> 2004 Revised Development Agreement 9:.9:..•• ..•. :. . . . •• . -. <br /> 17 <br /> 8/X0057/{8/20057/1120056/5/20056/5/20055/3/20051/11/200512/28/200410/18/20046/ 0046/19/20014/5/20048/18/2003 / 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.