My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/24 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:46:35 AM
Creation date
2/15/2017 10:45:56 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/24/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sloughing or slope failures. CSR AssociatedRinker shall not be responsible for ordinary <br /> vegetation management and/or landscaping. CSR AssociatedRinker shall expressly warrant the <br /> surface and subsurface stability of any slope repairs for an additional five(5) years.—fOuestioiff <br /> (j) Utilities. Pursuant to earlier agreement of the parties,prior to the <br /> execution of this Agreement,Ffor the purpose of serving the-each of the Transfer Lots, CSR <br /> AssociatedRinker agreeds to and has properly extended public water supply utilities, at its own <br /> expense, through the Sievers-Duecy Boulevard right of way no late'•than July 15, 20(Vl and <br /> provided sewer service at the time frontage improvements aie-were providedless-such <br /> - - . _ _ - , _ _ - . • -- . -- • • • ... - . The City has reviewed, inspected <br /> approved and accepted the utilities provided pursuant to this Section. CSA A tedRinker <br /> shal-lhas coordinated with the City's Parks and Engineering Departments as to location of stubs <br /> for sewer,and water and storm drainage service to each of the Transfer Lotsparcel. (Theso <br /> (k) Frontage Improvements. CSR AssociatedRinker shall provide curbs, <br /> gutters and sidewalk improvements to City standards for the each Transfer Lots on the southerly <br /> side of Sievers-Ducey Blvd. from Glenwood Ave. to Hardeson Road that are consistent with the <br /> frontage improvements required for the re-development of the Rinker Property under Part Two <br /> of this Agreement. CSR AssociatedRinker shall not be required to install frontage. <br /> improvements on the Transfer Lots until: (a) all necessary utilities have been extended to the <br /> Rinker Propertyg and (b) the frontage improvements can be installed simultaneously with <br /> frontage improvements required on the remainder of the Rinker Property; provided, however, in <br /> 2004 Revised Development Agreement !:!•-• . ` S _ `. 1•••.. . -• <br /> �. � 18 <br /> / G 8/1/20057/18/20057/11/20056/5!20056/5/2-0055/3/20054/11/200512/28/200410/18/20046/2-1/20016/19/20041/5/20048/18/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.