Laserfiche WebLink
• <br /> ECS Engineering,Inc b <br /> Fee Estimate Worksheet <br /> EXHIBIT B <br /> Date: 08/16/05 <br /> P04111 <br /> Description Prin. Mng Engr ir.Electrica Electrical Draft W/P Total <br /> Rate $138 $115 $104 $87 $78 $61 Costs <br /> Task-2 PUD Related Power <br /> Reliability Project Components <br /> I Develop preliminary layout&meet 4 20 1, $3,256 <br /> 2 Revise layout&deliver to PUD I 12 1 $1,698 <br /> 3 Develop preliminary costs I 4 $554 <br /> 4 Review PUD proposal 1 4 $968 <br /> 5 Meet with city to review PUD proposal 4 4 $968 <br /> Sub-Total $7,4441 <br /> Task 3-In-Plant Power Reliability <br /> Project Components <br /> 1 Meet with city develop initial concepts 1 4 $968 <br /> 2 Evaluate concepts&document findings 32 $3,328 <br /> 3 Prepare&submit draft findings 1 32 16 6 $5,202 <br /> 4 Met with city 4 4 $968 <br /> 5 Prepare&submit findings I 16 1 2 $2,236 <br /> Sub-Total $12,7021 <br /> Task 4-Separate Power Monitoring <br /> Project components <br /> 1 Kick-off Meeting 4 $416 <br /> 2 Develop criteria 1 16 $2,216 <br /> 3 Develop costs I 16 $1,802 <br /> 4 Prepare&submit draft findings I 8 $970 <br /> 5 Met with city 1 4 $968 <br /> 6 Prepare&submit findings I 4 $554 <br /> Sub-Total 56,9261 <br /> Task 5-Project Management <br /> I Develop project schedule 2 4 $692 <br /> 2 Project Set-up 2 .. $398 <br /> - - 3 Progress invoices 8 5 $1,592 <br /> 4 Prepare&distribute meeting minutes(6) 2 12 12 $2,256 <br /> 5 Project close out I 2 $260 <br /> Sub-I ural $5,1981 <br /> Task 6-Optional Services <br /> Provide services on an as-needed/as-approved <br /> basis <br /> Sub-Total <br /> Hour Totals 50 200 32 34 316 <br /> SUBTOTAL $32,270 <br /> MISC.EXPENSES $704 <br /> TOTAL $32,974 <br /> ECS ENGINEERING,INC. <br /> 2004 HOURLY RATES <br /> PRINCIPAL $138.00 <br /> MANAGING ENGINEER $115.00 The city shall pay the Contractor a sum equal to the amount of <br /> SR.ELECTRICAL $104.00 hours actually worked multiplied by the rate identified herein for <br /> ELECTRICAL $87.00 the staff performing the Work,plus reimbursable expenses, <br /> DRAFTING $78.00 subject to the maximum stated in Paragragh 4(D)of this Agreement <br /> ADMIN/WORD PROCESSING $61.00 <br /> Page 1 2' <br />