My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fehr & Peers 12/27/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
Fehr & Peers 12/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 1:29:51 PM
Creation date
2/15/2017 2:13:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Fehr & Peers
Approval Date
12/27/2016
Council Approval Date
12/21/2016
End Date
3/31/2018
Department
Transportation Services
Department Project Manager
Sabina Popa
Subject / Project Title
Development of ET's Long Range Plan
Tracking Number
0000429
Total Compensation
$251,299.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 9 <br /> 6.4. Draft Plan Development—Consultant will incorporate the material generated in Task 2,Task 3 and <br /> Task 6 to develop a draft Long Range Planning document that provides a clear vision for Everett Transit <br /> with a summary of the financial and capital support needed to achieve that vision. <br /> 6.5. Informative Outreach Update-Consultant will support Everett Transit in updating necessary <br /> online materials to provide information to the public highlighting the draft Long Range Planning <br /> document. It is assumed that any feedback or in-person outreach will be managed through Everett <br /> Transit staff. <br /> Deliverables: <br /> • Memorandum documenting the preferred service plan development and evaluation, the <br /> service standards development process and the supporting analysis from subtasks 6.1, 6.2 and <br /> 6.3. Memorandum will serve as an appendix in the final plan. <br /> • Draft Long Range Plan document, including necessary maps,graphics and text. <br /> Outreach: <br /> • Content necessary to update online materials and support Everett Transit staff. <br /> 7. Final Plan Development <br /> This task provides resources for the necessary modifications to the draft plan based in order to finalize the <br /> Long Range Plan for adoption by the City Council. <br /> 7.1. Final Long Range Plan—Consultant will support Everett Transit in finalizing the draft plan based on <br /> public, agency, and stakeholder feedback.The final Long Range Plan document will leverage graphics <br /> and figures to convey the message of the plan, with more detailed information provided in the <br /> appendices developed in prior tasks. <br /> 7.2. Plan Adoption—Consultant will provide support to Everett Transit staff for up to one revision of <br /> the planning document during the plan adoption process. It is assumed that a majority of the in-person <br /> and document updates will be completed by Everett Transit staff. <br /> Deliverables: <br /> • Final Planning document, including necessary maps,graphics and text with supporting <br /> appendices. <br /> Outreach: <br /> • No formal outreach is planned in this task. <br /> City of Everett Professional Services Agreement Everett Transit Long Range Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.