Laserfiche WebLink
10/3/2016 <br /> COST ESTIMATE: GRAND AVENUE PARK BRIDGE - EXTRA WORK <br /> SUPPLEMENT#2 <br /> October 3,2016 Stantec Stantec <br /> GRAND AVENUE PARK BRIDGE - EXTRA <br /> WORK SUPPLEMENT # 2 Project Manager Designer CAD Technician <br /> MULTIPLIER: <br /> Item SCOPE OF WORK $170.00 $140.00 $110.00 1.0000 <br /> 1 PROJECT MANAGEMENT <br /> Labor Subtotal: 0 0 0 $0 <br /> 2 GEOTECHNICAL ENGINEERING <br /> Labor Subtotal: 0 0 0 $0 <br /> 3 STRUCTURAL ENGINEERING <br /> Labor Subtotal: 0 1 0 0 $0 <br /> 4 CIVIL ENGINEERING <br /> Labor Subtotal: 0 0 0 $0 <br /> 5 ENVIRONMENTAL&PERMITTING <br /> Labor Subtotal: 0 0 0 $0 <br /> 6 ELECTRICAL ENGINEERING <br /> 6.10 Extra Work-Re design of Park Lighting 6 7 5 $2,550 <br /> 6.20 Extra Work-New design for 4"conduits 10 8 6 $3,480 <br /> Labor Subtotal: 16 15 11 $6,030 <br /> Labor Sum: 16 15 11 $6,030 <br /> Reimbursable Sum: $0 <br /> $6,030 <br />